Chapter 3
Installation
Copyright © 2007-2013 Eaton Corporation. All Rights Reserved.
IPN 997-00012-49G May 2013
19
C
h
a
p
t
e
r
3
Inst allation
Overview
Topic
Page
Task 1 - Check the AC Supply and Earthing
Task 3 - Connect the AC Supply Cable(s)
Task 4 - Mount the APS in the Rack
Task 5 - Connect the DC Load and Battery Cables
Task 6 - Install the Batteries
Task 7 - Mount the Battery Temperature Sensor
Task 8 - Connect External Input/Output Cabling (if required)
Task 9 - Connect Additional Input/Output (if required - SC200 only)
Task 10 - Connect to the AC Supply Point