Installation
Copyright © 2007-2013 Eaton Corporation. All Rights Reserved.
IPN 997-00012-49G May 2013
23
Step 5 - Check the earthing arrangements at the site
Confirm that all earths are brought together at one "star" point so that surge currents
cannot flow in "earth loops" and create large voltages.
For more information see Transient Protection on page
Procedure complete
Task 2 - Prepare APS
Step 1 - Fit the system controller (if required)
Ignore this Step if the system controller is already fitted.
1
Connect the power/communications cable from the APS to the RJ45 socket YS11
(RXP) socket on the back of the system controller.
2
Fit the system controller into the APS and tighten the retaining screw.
for position of system controller.
Step 2 - Check polarity
The APS can be configured for either positive earth or negative earth operation.
1
Remove top cover if fitted.
2
Check the polarity label on the dc common bus bar(s).
(+) on the common bar(s) indicates positive earth. (-) indicates negative earth.
3
If the polarity of the APS matches the equipment at the site then no further action
is required.
4
If the polarity of the APS is not correct for the equipment to be powered then
contact your Eaton dc product supplier for advice (see Worldwide Support on
page
Step 3 - Check position of mounting brackets
APSs are pre-assembled with 19-inch rack-mounting brackets as shown in the
following diagram. If required, the brackets can be moved to alternative positions to
reduce the effective depth of the unit.
Rack-mounting brackets are also available for use in 23-inch wide racks.
1
Remove top cover if fitted.
2
Undo the two screws holding each bracket.
3
Refit the brackets at the required location. Tighten the screws.