EATON HEVC 5005
Installation, Operation and Maintenance Manual E-CLCL-CC002-E2
May 2017
3
Table of contents
Section Description
Page no
1.0 Introduction
5
1.1 Description
5
1.2
How it works
5
1.3
Clutch adjustment
5
2.0 Installation
6
2.1
Mounting arrangements
6
2.2
Mounting considerations
7
2.3
Mounting spider and drum hub
7
2.4
Shaft alignment
8
2.5
Axial locking device adjustment
9
2.6
Installation of element and drums (dual wide)
9
2.7
Air control system
11
2.8
Electrical controls
12
3.0 Operation
12
3.1
Torque, RPM and Pressure Limits
12
3.2
Control component adjustment
12
4.0 Maintenance
13
4.1
Periodic inspection
13
4.2
Removal of element assembly and drum (dual wide)
15
4.3
Removal of spider and drum hub
15
4.4
Disassembly of the element
15
4.5
Friction lining replacement
16
4.6
Assembly of the element
16
5.0
Spare parts storage
16
5.1
Element assemblies
16
5.2 Drums
16
5.3
Air actuating tubes
16
6.0
Ordering information/technical assistance
17
6.1
Equipment reference
17
7.0
Parts list
18
7.1
Dual wide element assemblies
18
7.2
Axial locking devices
19
7.3 Drums
19
7.4
Upgrade kit VC to HEVC
20
7.5
Rebuild kit HEVC
20
7.6
Friction segment and rivet kit
20
7.7
Friction Shoe Assembly (FSA) kit
20
8.0 Revision
21