
INSTALLATION
Eaton 9910 UPS and EBM Installation Guide (6000 VA Models)
S
P-164000007 Rev 1
24
12.
Loosen the thumbscrew [1] on the battery retaining bracket, slide
the bracket to the left [2], rotate the bracket out [3], then slide the
bracket to the right and remove it [4].
Figure 9. Removing the Battery Retaining Bracket
13.
Using the plastic tab, carefully pull one battery module out of the
bay and place it on a sturdy, flat surface. Repeat for the second
battery.
Figure 10. Removing the UPS Internal Batteries