Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 7
www.eaton.com/powerquality
4-1
Chapter 4
Installation
This chapter includes installation instructions for the Eaton 93PM 150 kW AND 200 kW Sidecar Integrated
Accessory Cabinet-Bypass (SIAC-B).
4.1
Preliminary Installation Information
WARNING
Installation should be performed only by qualified personnel.
Refer to the following while installing the SIAC-B:
l
Chapter 3 for cabinet dimensions, equipment weight, wiring and terminal data, and installation notes.
l
Do not tilt the cabinets more than
±
10
during installation.
Use the applicable procedure from the following list for the type of installation being performed:
l
For field installation of a separately shipped SIAC-B, proceed to paragraph 4.2.
l
For site removal and reinstallation of the SIAC-B, proceed to paragraph Figure 4.5.
l
For a factory installed SIAC-B, proceed to paragraph 4.6.
4.2
Unloading the Field Installed SIAC-B from the Pallet
The SIAC-B is bolted to a pallet consisting of four metal angle supports secured to two wood supports and four
vertical braces.
WARNING
The SIAC-B is heavy (approximately 220 kgs/486 lbs). If unpacking and unloading instructions are
not closely followed, the cabinet may tip and cause serious injury.
CAUTION
l
Do not tilt cabinet more than 10° from vertical.
l
Lift the cabinet only with a forklift or damage may occur.
NOTE
The SIAC-B is attached to and directly integrated with the UPS cabinet at the factory
or after field installation on sight. This section must be used along with the
applicable Eaton 93PM UPS Installation and Operation manual, listed in paragraph
1.7, during installation.
Summary of Contents for 93PM 150 kW SIAC-B Three-Wire
Page 2: ......
Page 19: ...Section 1 Installation ...
Page 20: ......
Page 75: ...Section 2 Operation ...
Page 76: ......
Page 105: ......
Page 106: ... P 164000387 7 P 164000387 7 ...