
Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 7
www.eaton.com/powerquality
3-1
Chapter 3
Installation Plan and Unpacking
This chapter includes planning for the Eaton 93PM 150 kW and 200 kW Sidecar Integrated Accessory
Cabinet-Bypass (SIAC-B).
Use the following basic sequence of steps to install the SIAC-B:
1.
Create an installation plan for the SIAC-B.
2.
Prepare your site for the SIAC-B.
3.
Inspect and unpack the SIAC-B (refer to the applicable Eaton 93PM UPS Installation and Operation
manual, listed in paragraph 1.7, for inspection and unpacking instructions).
4.
Unload and install the SIAC-B (refer to the applicable Eaton 93PM UPS Installation and Operation manual,
listed in paragraph 1.7, for inspection and unpacking instructions).
5.
Externally wire the SIAC-B.
6.
Complete the Installation Checklist.
7.
Have authorized service personnel perform preliminary operational checks and start up the system.
3.1
Creating an Installation Plan
Before installing the SIAC-B, read and understand how this manual applies to the system being installed. Use
the procedures and illustrations in this section to create a logical plan for installing the SIAC-B.
3.2
Preparing the Site
For the UPS system to operate at peak efficiency, the installation site should meet the environmental
parameters outlined in this manual. The operating environment must meet the weight, clearance, and
environmental requirements specified for the applicable accessory cabinet. Specifications subject to change.
3.2.1
Environmental and Installation Considerations
The UPS system installation, including the SIAC-B, must meet the following guidelines:
l
The system must be installed on a level floor suitable for computer or electronic equipment.
l
The system must be operated at an altitude no higher than 1500m (5000 ft) without derating. For additional
assistance with high altitude operation, contact an Eaton service representative (see paragraph 1.8).
l
The system must be installed in a temperature and humidity controlled indoor area free of conductive
contaminants.
Failure to follow guidelines may void your warranty.
NOTE
The SIAC-B is attached to and directly integrated with the UPS cabinet at the factory
or after field installation on sight. This section must be used along with the
applicable Eaton 93PM UPS Installation and Operation manual, listed in paragraph
1.7, during installation planning and unpacking.
NOTE
Startup and operational checks must be performed by an authorized Eaton
Customer Service Engineer, or the warranty terms specified on page W-1 become
void. This service is offered as part of the sales contract for the UPS. Contact an
Eaton service representative in advance (usually a two-week notice is required) to
reserve a preferred startup date.
Summary of Contents for 93PM 150 kW SIAC-B Three-Wire
Page 2: ......
Page 19: ...Section 1 Installation ...
Page 20: ......
Page 75: ...Section 2 Operation ...
Page 76: ......
Page 105: ......
Page 106: ... P 164000387 7 P 164000387 7 ...