4.5
Installing Interface Connections
4.5.1 Installing Building Alarm Connections
To install wiring:
1.
Verify the UPS system is turned off and all power sources are removed. See Chapter 6, “UPS Operating
Instructions", for shutdown instructions.
2.
To locate the appropriate terminals and review the wiring and termination requirements, see
paragraph 3.2.3, Table 4-1, Figure 4-5 and Figure 4-6.
3.
External input signal cables can enter the UPS via left, right side panel or a knockout in the top of the
cabinet, see Figure 4-8.
4.
Connect the building alarm interface wiring as shown in Table 4-1 and Figure 4-7.
6.
If wiring parallel connections, proceed to paragraph 4.5.2; if wiring Mini-Slot connections, proceed to
paragraph 4.5.3;
Figure 4-6. Interface Terminal Locations
Mini-Slot Communication Bays
(see Figure 4-6 for details)
Front Middle Cover Plate
Interface Terminals
(see Figure 4-6 for details)
Rear View
28
Eaton 93E
MK2
UPS (10-40kVA, 380/400/415V) Installation and Operation
Summary of Contents for 93E MK2
Page 1: ...Eaton 93E MK2 UPS 10 40 kVA 380 400 415V Installation and Operation Manual...
Page 2: ......
Page 4: ......
Page 8: ......
Page 49: ...Notes 39 Eaton 93E MK2 UPS 10 40kVA 380 400 415V Installation and Operation...
Page 94: ......
Page 95: ......
Page 96: ...614 00389 00...