3
200 A 15/25 kV class elbow installation instructions
InstallatIon InstructIons
MN650042EN February 2017
Preparation of concentric neutral cable
Step 1
Measure down from top of the cable a minimum of 8 1/2”.
Remove cable jacket (if jacketed cable is used) to expose
neutral wires.
Unwind neutral wires.
otee:
N
If an Eaton Cooper Power series jacket seal is used,
follow instructions supplied with the jacket seal kit.
Step 2
Measure down from top of the cable 5 3/4”.
Remove the insulation shield. Take care not to nick or
gouge insulation.
Step 3
Measure down from the top of the cable 1 15/16”.
Remove the insulation and conductor shield to expose the
bare conductor. Take care not to nick the conductor.
Place a 1/8” bevel on the insulation to ease installation.
Step 4
If not already in place, apply a suitable jacket seal over the
jacket and exposed neutral wires.
Proceed to Step 5.
First
crimp
placed
below
knurl
Clean
and
lubricate
Clean
excess
inhibitor
grease
Step 5
Step 6
Step 7
Clean and
lubricate cable
entrance
Clean and
lubricate
Attach
ground lead
to elbow
ground tab
Attach lead
to system
ground