Final Checks
Eaton-Williams
Low Temperature DX Cassette
Page 15
QLC/ICU
Document 0412124
Issue 2.1 05/06
Check
1. Have all option kits been fitted?
2. Have units been mounted level and correct drainage been checked?
3. Have the suction line, expanded liquid line (if required) and condensate drains (if required) been adequately
insulated?
4. Has the correct HRC external fusing / isolation been installed?
5. Has the additional site top-up and extended pipe run refrigerant charge been measured into the system?
6. Has the control system been explained to the customer and the operating manual sheet handed over with
the appropriate section completed?
7. Has the warranty booklet been read and completed?
Note
If a service contract is not taken out only a 1-year warranty is applicable.