22 Operation
Eastey EZ-EX Main Spring Adjustment
For the Eastey-EX tape head, there is an
adjustment link at the end of the main spring
that links the spring to the stud post.
Spring tension is determined by which part of
the adjustment link is hooked onto the stud
post on the connecting arm, and by which
hole in the adjustment link the main spring is
hooked onto.
Eastey-EX Main Spring Adjustment
For the EZ-EX tape head, there are two
adjustment nuts, one to each side of the top
crossmember where the threaded rod of the
adjustable end of the main spring passes
through the crossmember.
The adjustment nuts are used together to set
the main spring to the required tension and to
secure the spring at the set tension.
Moderate Tension
Most Tension
Least Tension
Decrease Tension
Increase Tension
Main
Spring
Outer
Nut
Inner
Nut
Cross
Member
Adjustment
Link
Main
Spring
Stud
Summary of Contents for SB-2EX-Auto
Page 1: ...SB 2 3EX Auto Automatic Case Taping System User Guide...
Page 2: ......
Page 4: ......
Page 16: ...16 Installation Air Supply Line In Air In...
Page 38: ...38 Parts Lists Parts List Electrical 1 19 24 25 30 31 32 Optional Optional...
Page 39: ...Parts Lists 39...
Page 43: ...Parts Lists 43 Side Belts...
Page 46: ...46 Parts Lists Vertical Column with Height Adjustment...
Page 51: ...Parts Lists 51 Machine Body...
Page 53: ...Parts Lists 53 Infeed Index Roller Table...
Page 55: ...Parts Lists 55 Options...
Page 57: ...Appendix A Electrical Schematic 57 Appendix A Electrical Schematic...
Page 58: ...58 Appendix A Electrical Schematic Electrical Schematic Continued...
Page 59: ...Appendix A Electrical Schematic 59 Electrical Schematic Continued...
Page 60: ...60 Appendix A Electrical Schematic Electrical Schematic Continued...
Page 61: ...Appendix A Electrical Schematic 61 Electrical Schematic Continued...
Page 62: ...62 Appendix A Electrical Schematic Electrical Schematic Continued...
Page 66: ......
Page 67: ......