Installation and Setup 13
Set Machine Height
To adjust the leg height, loosen the screws shown on each leg. Slide the insert up or
down to the required height, and then refasten the screws.
Location Requirements
To move the BB-2 to the desired location you will need to use a pallet jack or fork lift. If
you have purchased the optional locking casters you can move the taper easily over a
smooth flat surface.
When installing the BB-2 Taping System please be aware of the following
considerations:
•
The mounting surface is flat and level.
•
Conveyor or packing table height.
•
Alignment with packaging line.
When the BB-2 Taper is installed in the operating location you will need access to:
•
The power switch.
•
Height and width adjustments.
•
Tape loading (Both upper and lower tape cartridges).
A packing table may be provided at the in feed end where the packer can fill boxes and
close the flaps prior to feeding the boxes into the machine. It is also convenient to have
a pack table at the exit end of the taper.
It is essential that the table and conveyor be at the machine bed height.
The machine should be placed on a flat, level floor so that it does not rock or move.
Optional locking casters are available to provide portability; however, we recommend
that the machine be securely locked in place when used.
Screw
Screw
Summary of Contents for BB-2
Page 1: ...BB 2 Industrial Case Taping System User Guide...
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ...8 Safety...
Page 20: ...20 Installation and Setup...
Page 22: ...22 Installation and Setup...
Page 24: ...24 Adjustments...
Page 50: ......