Maintenance 29
Take the belt off the machine.
Install the new belt around the drive and idler pulleys.
While the belt is still loose connect the ends by lining up the zipper and replacing the
copper connecting pin.
From underneath push the idler pulley back into the up position to tighten the belt.
Connecting Pin
Drive Belt
Summary of Contents for BB-2
Page 1: ...BB 2 Industrial Case Taping System User Guide...
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ...8 Safety...
Page 20: ...20 Installation and Setup...
Page 22: ...22 Installation and Setup...
Page 24: ...24 Adjustments...
Page 50: ......