Purpose :
Most
DRO
cabinet on the market provide just two set of work co-ordinates -
ABS/INC
. It was
found that
ABS/INC
was inadequate and inconvenient to use, and, particularly in the case of
complex machining or repetitive work, which needed more than just two sets of working
co-ordinates.
ABS / INC
operation has the following shortfalls :
- In much machining work, the work-piece machining dimensions are derived from more than
two datums, therefore, the operator has to switch between
ABS
and
INC
to set up the
machining datums time after time. This process is very time consuming and prone to error.
- In the case of batch machining of repetitive work, the operator has to set up and calculate
all the machining positions time after time.
SC-100
provides a
199
subdatum (
SdM
) memory to cope with the shortfalls of
ABS/INC
.
SdM
function does not just simply provide
199
sets of
INC
co-ordinates, it is specially designed to provide much
more convenient features for the operator to cope with repetitive work.
The difference between
INC
and
SdM
is as follows:.
1.
INC
is independent of
ABS
and will not follow any change in
ABS
zero point. All S
dM
co-ordinates are relative to the
ABS
coordinates, so, all
SdM
positions will move together
when the
ABS
zero position changes.
2. All
SdM
relative distance data to
ABS
can be entered directly into
SC-100
memory using the
keypad. No need for any additional calculations.
SdM application in a work piece that has more
that one datum.
Operator can store all the work subdatums in
SC-100's memory as per follows.
(
sdm 2
)
Subdatum 2
(
ABS
)
Work piece
main datum
(
sdm 1
)
Subdatum 1
(
sdm 4
)
Subdatum 4
(
sdm 3
)
Subdatum 3
Operator then can
switch between
the subdatums directly
by pressing key
No need to refer back
to ABS coordinate and
set up the subdatums
from their relative
distance from ABS point
(
sdm 3
)
point
3
(
ABS
)
Work Piece Datum (0.000)
(
sdm 2
)
point
2
(
sdm 4
)
point
4
(
sdm 1
)
point
1
SdM application on the repetitive batch machining of
parts
Because all sdm subdatums (0.000) are relative to
ABS zero, so, for any repeative work, the
operator just needs to set up the first work piece zero
at ABS and store the machining position in subdatum
zero.
For anymore repeative parts, just set up the 2nd, 3rd..
work piece zero at ABS, then all the machining
positions will reappear
Press Up/Down
key to go to
machining points
move the machine
to display = 0.000,
then machining
location reached
or
or
- 10 -
DIGITAL COUNTER
Made in Taiwan
SC-103
Sdm 2
0.000
0.000
abs
inc
½
ref
sdm
inch
mm
R
R
R
9
8
7
4
5
6
1
2
3
CE
0
cal
sin
COS
tan
M
in
M
R
+
ENT
ENT
ENT
ENT
X
X
0
Y
Y
0
Z
Z
0
DIGITAL COUNTER
Made in Taiwan
SC-103
Sdm 2
abs
inc
½
ref
sdm
inch
mm
R
R
R
9
8
7
4
5
6
1
2
3
CE
0
cal
sin
COS
tan
M
in
M
R
+
ENT
ENT
ENT
ENT
X
X
0
Y
Y
0
Z
Z
0
Summary of Contents for Premium SC-100
Page 2: ......
Page 8: ......
Page 13: ...5...
Page 17: ...9 sdm 3 3 sdm 2 2 sdm 4 4 ABS sdm 1 1...
Page 26: ......
Page 28: ......
Page 33: ...25...
Page 38: ......
Page 39: ...31...
Page 47: ...39...
Page 53: ...45 R R R...
Page 69: ...61 R R R...
Page 86: ......
Page 87: ...79...
Page 88: ......
Page 108: ......