Assembly and Operation Instructions
F80_RevNov_21
PAGE 4
Step 8:
Insert the PIVOT ROD into the
ROD CLIP that is installed in the PIVOT
BRACKET.
Note:
Make sure to ensure that
the ROD CLIP is installed as shown to the
right.
Step 9:
Note:
Before installing GAUGE and
UPPER HANDLES to HANDLE SHAFT, UPPER
HANDLES feature two positions for operator’s
comfort.
If operator chooses upper position, use HANDLE
SPACER in hole nearest to HANDLE GRIPS.
Insert 2” bolt through UPPER HANDLE, then
through HANDLE SPACER through other UPPER
HANDLE and secure with locknut.
DO NOT
TIGHTEN LOCKNUT YET. TIGHTEN THIS NUT
LAST.
Now slide the UPPER HANDLE assembly over
the HANDLE SHAFT
(on the end with
the bolt
holes closer to the end).
Install GAUGE &
LEVER using (2) 2” bolts. Be sure GAUGE is on
left hand side. Tighten locknuts to GAUGE first.
TIGHTEN ALL
HARDWARE NOW
Step 10:
Insert PIVOT ROD into SHUT-OFF PLATE as shown. Turn to lock in place.
Thighten ALL hardware then insert other end of PIVOT ROD into PIVOT AND BRACKET assembly as shown. Turn to lock
in place.
Step 11:
Tighten ALL hardware then insert other end of PIVOT ROD into PIVOT AND BRACKET assembly as shown.
Turn to lock in place.
Step 12:
I
nstall HANDLE SHAFT to LOWER HANDLEs and PIVOT & BRACKET assembly as shown. Using 2″ bolts and
locknuts.
TIGHTEN BOLTS AND NUTS NOW.
¼
-20
Hex Nuts
Pivot
Bracket
Control
Rod
Pivot
Rod
Rod
Clip