background image

Assembly and Operation Instructions 

 

P2170_M52164_Rev_May2020_compressed

 

PAGE 11 

Broadcast Setting Matrix

 

Calibration Techniques 

How to ensure your spreader is properly calibrated 

Make sure the drop holes in the bottom of the hopper are fully open when the Rate Control handle is on #30. If not, 
please adjust control cable or control rod to allow for a full open hopper position at #30.  

Rod Type Adjustment 
1.

 

Open the shut-off so that the drop holes are completely open as 
illustrated to the right. 

2.

 

Review the Control Lever position

if it is set so that the forward 

edge is at #30, you are calibrated. If not, you need to adjust the 
control rod at the pivot bracket shown in 

Fig 1

A.

 

If your shut-off is not able to open fully as in step #1. Loosen 
the top nut a few turns, then loosen the lower nut so that it 
allows you to push the shut-off open fully. Next tighten each 
nut so that they contact the pivot bracket without moving it, 
and then carefully tighten each nut fully so they do not loosen 
during use. Recheck adjustment as outlined in #1 above. 

B.

 

If your shut-off is able to open fully as in step #1, but the 
Control Lever is not at #30. Loosen the top nut a few urns, then 
loosen the lower nut so that it allows you to push the Control 
Lever to #30. Next tighten each nut so that they contact the pivot bracket without moving it. Carefully tighten 
each nut fully so they do not loosen during use. Recheck adjust as outlined in #1 above. 

Cable Type Adjustment 
1.

 

Open the Control Lever so that the shut-off and drop holes are completely open as illustrated above right. 

2.

 

Review the Control Lever position so that the indicator is pointed to #30, if it is your calibration is correct. If not you 
need to adjust the control cable at the cable clamp on the underside of the hopper as shown in 

Fig 2.

 

A.

 

If your shut-off is not able to open fully as in step #1. Loosen the cable clamp screw slightly so that you can slide 
the outer cable out so that the shut-off is fully open. Next tighten the cable clamp screw securely. Recheck 
adjustment as outlined in #1 above.  

B.

 

If your shut-off is able to open fully as in step #1, but the Control Lever is not at #30. Loosen the cable clamp 
screw slightly so that you can slide the outer cable in so that the Control Lever opens to #30. Next tighten the 
cable clamp screw securely. Recheck adjustment as outlined in #1 above. 

If you have any questions regarding the operation or assembly of your spreader please call us at 574-848-7491 Monday - 
Friday 9:00am - 4:00pm Eastern. 

Accessories and Repair Parts

 are also available at these numbers. 

 

 

Summary of Contents for 2170

Page 1: ...CONTROL Your EarthWay spreader includes a feature called side spread control This feature turns off fertilizer from being spread to the left side To activate this feature slide the lever below the ho...

Page 2: ...oroughly after each use Coat all metal surfaces pay special attention to the inside outside of tubing it s easiest to do while assembling with light oil Fluid Film or silicon spray to help prevent cor...

Page 3: ...e EarthWay logo is on the front of the hopper Step 5 A Install lower handles onto the frame to both sides as shown Insert 2 bolt through second hole in lower handle and through first hole in frame and...

Page 4: ...TIGHTEN Step 7 Slide axle bushing over axle and into axle bearing to both sides as shown Step 8 Install drive wheel onto the axle and align with the cotter pin hole nearest to lower handles as shown I...

Page 5: ...4_Rev_May2020_compressed PAGE 5 TURN SPREADER UPRIGHT ON TO WHEELS Step 10 Insert 2 bolt through Gauge Lever assembly next through upper handle then the handle shaft and then the other upper handle an...

Page 6: ...Turn to lock in place Step 12 Insert other end of pivot rod into pivot and bracket assembly as shown Turn to lock in place Step 13 Install handle shaft to lower handles and pivot bracket assembly as s...

Page 7: ...er is in the full open position REMEMBER SETTING 30 ON THE FLOW CONTROL LEVER MUST PLACE THE SHUT OFF PLATE IN THE FULL OPEN POSITION TO BE PROPERLY CALIBRATED Now tighten the nuts against the pivot b...

Page 8: ...the part s or product any labor charges associated with repair or replacement of non conformances are specifically excluded Due to the corrosive nature of most fertilizers and ice melt products Earth...

Page 9: ...d Control slide the control lever from the front to the back This will activate the SideSpred Control for a PARTIAL spread pattern and prevent material from being spread to the left side of the spread...

Page 10: ...3 HANDLE SHAFT SQ 17 42256 CONTROL ROD 18 31138 8 X 3 8 PMT 8 HD COARSE BLACK 19 36300 1 4 20 NYLON INSERT LOCKNUT S S 20 32100 1 4 20 HEX NUT ZINC 21 36208 6 X 3 8 TYPE 25 PHPS S S 22 12317SSC SHUT O...

Page 11: ...the lower nut so that it allows you to push the Control Lever to 30 Next tighten each nut so that they contact the pivot bracket without moving it Carefully tighten each nut fully so they do not loos...

Page 12: ...nd the closest LBS 1 000 square feet in Broadcast Setting Matrix below based on the material particle size Example 2 0 LBS 1 000 square feet Spreader Setting of 10 13 or 18 based on particle size The...

Reviews: