CCA-410-IM (03/15)
Page 15
Figure 8d. TXV Control Box Mounting Positions
The following steps and positioning requirements apply to installing the TXV Control to the cased coil for
vertical and horizontal applications. The vertical installation provides an illustrated example.
Step 1:
Relieve the nitrogen holding charge on the air handler using the valve on the liquid line stub out.
Locate the TXV Control box within the 3-1/2 feet of the suction line stub out on the cased coil.
Fasten
the TXV control box above the suction line stub out.