PSD-QS (02/16)
Page 6
Safety
Warning, Caution and Important notices appear throughout the manual. Read these items carefully
before attempting installation, servicing or troubleshooting the equipment.
Equipment M anuals
The following is a listing of the equipment installation manuals that are provided with each component
specified for this EarthLinked
®
system.
Series AVS and AVV Air Handler
Series CCS Cased Coil
Series HCM Hybrid Cooling Module
Series GSTE Storage Water Heater
Earth Loop Specification and Installation Manual
Earth Loop Protection Kit Installation Manual
IMPORTANT!
Notification of installation, operation or maintenance information which
is important, but which is not hazardous.
WARNING!
Indicates a hazardous situation, which if not avoided will result in
serious injury or death, or equipment or property damage.
CAUTION!
Indicates a potentially hazardous situation or an unsafe practice, which
if not avoided, may result in injury, or equipment or property damage.
IMPORTANT!
Read and follow all installation instructions in these manuals,
appropriate for the EarthLinked
®
system being installed, BEFORE
initiating the Start-Up procedure.
Summary of Contents for Prime-025
Page 15: ...PSD QS 02 16 Page 15 Figure 8 PSD Compressor Unit Electrical Schematic 230 1 60...
Page 16: ...PSD QS 02 16 Page 16 Figure 9 PSD Compressor Unit Electrical Schematic 230 3 60...
Page 17: ...PSD QS 02 16 Page 17 Figure 10 PSD Air Heating Cooling Water Heating Application...
Page 18: ...PSD QS 02 16 Page 18 Figure 11 PSD Air Heating CoolingWater Heating Field Wiring Diagram...
Page 20: ...PSD QS 02 16 Page 20 Figure 11a SureStart Mode of Operation...
Page 27: ...PSD QS 02 16 Page 27 Figure 15 Disassembled Plug Connector...
Page 34: ...PSD QS 02 16 Page 34 Figure 24 PSD Internal Flow Schematic...
Page 35: ...PSD QS 02 16 Page 35 Figure 25 PSD Piping...
Page 37: ...PSD QS 02 16 Page 37 Figure 26 Evacuation of PSD System...
Page 39: ...PSD QS 02 16 Page 39 Figure 27 Initial Charge of PSD System...
Page 41: ...PSD QS 02 16 Page 41 Figure 28 Final Charge of PSD System...
Page 44: ...PSD QS 02 16 Page 44 Figure 32 Start Up Process...
Page 53: ...PSD QS 02 16 Page 53...
Page 54: ...PSD QS 02 16 Page 54...
Page 55: ...PSD QS 02 16 Page 55...
Page 56: ...PSD QS 02 16 Page 56...
Page 57: ...PSD QS 02 16 Page 57...
Page 58: ...PSD QS 02 16 Page 58...