Start-Up Process
1)
System Leak Check
After all indoor and outdoor refrigerant bearing components of the system have been installed and
joints have been nitrogen brazed, pressurize the system prior to evacuation to leak test the system.
Do not exceed 150 psig when pressure testing the compressor unit and indoor system components.
Test for leaks with a sensitive electronic leak detector and bubble solution.
Repair leaks as appropriate prior to evacuation.
Evacuation and charging of the system is done through the compressor unit. All of the refrigerant
containing components in the compressor unit are illustrated in Figures 24 and 25.
The Start-up Process is illustrated in Figure 32.
CAUTION!
During the Evacuation and Initial Charging processes, be sure that ALL
power to the EarthLinked
®
System is OFF. This includes the
compressor unit, air handler and all other electrically powered system
components. Failure to do so will cause lockout on start-up.
Summary of Contents for Prime-025
Page 15: ...PSD QS 02 16 Page 15 Figure 8 PSD Compressor Unit Electrical Schematic 230 1 60...
Page 16: ...PSD QS 02 16 Page 16 Figure 9 PSD Compressor Unit Electrical Schematic 230 3 60...
Page 17: ...PSD QS 02 16 Page 17 Figure 10 PSD Air Heating Cooling Water Heating Application...
Page 18: ...PSD QS 02 16 Page 18 Figure 11 PSD Air Heating CoolingWater Heating Field Wiring Diagram...
Page 20: ...PSD QS 02 16 Page 20 Figure 11a SureStart Mode of Operation...
Page 27: ...PSD QS 02 16 Page 27 Figure 15 Disassembled Plug Connector...
Page 34: ...PSD QS 02 16 Page 34 Figure 24 PSD Internal Flow Schematic...
Page 35: ...PSD QS 02 16 Page 35 Figure 25 PSD Piping...
Page 37: ...PSD QS 02 16 Page 37 Figure 26 Evacuation of PSD System...
Page 39: ...PSD QS 02 16 Page 39 Figure 27 Initial Charge of PSD System...
Page 41: ...PSD QS 02 16 Page 41 Figure 28 Final Charge of PSD System...
Page 44: ...PSD QS 02 16 Page 44 Figure 32 Start Up Process...
Page 53: ...PSD QS 02 16 Page 53...
Page 54: ...PSD QS 02 16 Page 54...
Page 55: ...PSD QS 02 16 Page 55...
Page 56: ...PSD QS 02 16 Page 56...
Page 57: ...PSD QS 02 16 Page 57...
Page 58: ...PSD QS 02 16 Page 58...