Figure 33. Compressor Unit Voltage Information
The following compressor checklist is provided to analyze the compressor and determine if it is
operating properly or if it is faulty:
1. Electrical Service Panel
– turn power off.
a. Check circuit connections for tightness
b. Circuit breaker sized right?
c. Wire size correct? (check NEC or local codes)
2. Check capacitor
or other start components for bulges, overheating or loose
connections.
3. Test capacitor
and start components and replace if necessary. Capacitors can be
checked by substitution or with capacitance meter. OK if reads ±10% of the
manufacturer’s specification.
4. Check incoming power supply voltage
to determine whether it is within acceptable
voltage range. (See Figure 33)
5. Check voltage at compressor unit terminals
to determine whether it is within
acceptable voltage range. (See Figure 33)
6. Running Amperage.
Connect a clip-on type ammeter to the (common) lead to the
compressor. Turn on the supply voltage and energize the unit. The compressor will
initially draw high amperage; it should soon drop to the RLA value (See Figure 7) or less.
If the amperage stays high, check the motor winding resistance and/or run capacitor.
Summary of Contents for Prime-025
Page 15: ...PSD QS 02 16 Page 15 Figure 8 PSD Compressor Unit Electrical Schematic 230 1 60...
Page 16: ...PSD QS 02 16 Page 16 Figure 9 PSD Compressor Unit Electrical Schematic 230 3 60...
Page 17: ...PSD QS 02 16 Page 17 Figure 10 PSD Air Heating Cooling Water Heating Application...
Page 18: ...PSD QS 02 16 Page 18 Figure 11 PSD Air Heating CoolingWater Heating Field Wiring Diagram...
Page 20: ...PSD QS 02 16 Page 20 Figure 11a SureStart Mode of Operation...
Page 27: ...PSD QS 02 16 Page 27 Figure 15 Disassembled Plug Connector...
Page 34: ...PSD QS 02 16 Page 34 Figure 24 PSD Internal Flow Schematic...
Page 35: ...PSD QS 02 16 Page 35 Figure 25 PSD Piping...
Page 37: ...PSD QS 02 16 Page 37 Figure 26 Evacuation of PSD System...
Page 39: ...PSD QS 02 16 Page 39 Figure 27 Initial Charge of PSD System...
Page 41: ...PSD QS 02 16 Page 41 Figure 28 Final Charge of PSD System...
Page 44: ...PSD QS 02 16 Page 44 Figure 32 Start Up Process...
Page 53: ...PSD QS 02 16 Page 53...
Page 54: ...PSD QS 02 16 Page 54...
Page 55: ...PSD QS 02 16 Page 55...
Page 56: ...PSD QS 02 16 Page 56...
Page 57: ...PSD QS 02 16 Page 57...
Page 58: ...PSD QS 02 16 Page 58...