(MS21042L3).
G13006
C
1:1
3
GA182
P139-HD BELL 206/407 INSTALLATION
10/30/08
CLB
10/30/08
6
CLB
WASHERS (NAS1149F0332P) AND (4) #10-32 LOCKNUTS
INSTALLED EQUIPMENT. IT IS THE INSTALLERS
1
EQUIPMENT. MOUNT ROUTER AFT OF FUEL CELL AREA.
MS24693S277 #10 X 1-1/8" FLAT HEAD SCREWS, (8) #10
MOUNT TRAY TO DECK USING (2) SHIMS G13009-3, (4)
PULL RIVETS MS20600AD4-2 (CR9163-4-2).
DOES NOT INTERFERE WITH OTHER INSTALLED
RESPONSIBILITY TO MAKE SURE THIS INSTALLATION
MAINTAIN 2 E/D EDGE MARGIN FOR ALL MOUNTING
HOLES.
Sheet 1 of 1
ROUTER USING (2) #6-32 x .5 FLAT HEAD SCREWS
INSTALL SUPPORT HOOK NAS622CE2 TO FRONT OF
FOR EACH DOUBLER, BACKDRILL HAT RACK DECK
ARM IS DEPENDENT ON MOUNTING LOCATION
INCLUDING ROUTER BOX = 4.4 LBS
WEIGHT OF INSTALLED COMPONENTS
SECURE ROUTER TO TRAY
AND AIRCRAFT MODEL
AND INSTALL (12) #4 RIVETS, MS20470AD4-4 OR USE
MS24693S28.
AND DEVICES INSTALLED. ORIENTATION OF THE TRAY IS
AT THE INSTALLERS DESCRETION.
LOCATE TRAY G13009 TO AVOID EXISTING STRUCTURES
2
4
INSTALLATION INSTRUCTIONS
THIS INSTALLATION PROVIDES MOUNTING PROVISIONS
FOR THE G13000 P139-HD ROUTER IN THE HAT RACK
AREA FOR BELL 206 / 407 SERIES HELICOPTERS.
LOCATION SHOWN IS FOR REFERENCE ONLY, EXACT
PLACEMENT IS DEPENDENT ON OTHER PRE-EXISTING
5
INSTALL CLIP G13006-2 TO BASE OF ROUTER USING (2)
#8-32 X .62 FLAT HEAD SCREWS (MS24693S51)
C
4/11/12
REMOVED FN6; REPLACED TRAY G13006-1 WITH
CLB
.XXX
ANYONE WITHOUT THE WRITTEN PERMISSION OF GENEVA AVIATION, INC.
DATE
CHECKED
Design
Drawing Number
Pro No:
REV
D
CLB
TO GENEVA AVIATION AND SHALL NOT BE USED OR DUPLICATED BY
DIMENSIONS ARE IN INCHES
Title
SIZE
UNLESS OTHERWISE SPECIFIED
THIS DOCUMENT INCLUDES INFORMATION PROPRIETARY
ADDED FN6
TOLERANCES ARE:
G13009 AND UPDATED MOUNTING HARDWARE
CLB
1/13/12
B
2
10/07/09
FRACTIONS
.010
1/8"
.030
BREAK SHARP EDGES
REVISIONS
REV
DESCRIPTION
APPROVED/DATE
DRAWN
Approval
A
B
C
1
2
3
1
2
3
4
A
B
C
D
4
D
Scale:
DATE
DATE
DATE
A
DECIMAL
.X .050
.XX
ANGLES
CHANGED FN4 TO REPLACE #8-32 X .50 WITH X.62
LONG SCREWS.
G13000
FS 167.33 (206L & 407)
P139-HD ROUTER
HAT RACK DECK
HAT RACK INSTALLATION
ALTERNATE MOUNTING LOCATION
FS 179.66 (206L & 407)
FWD
FS 154.66 (206 A/B)
FS 142.33 (206 A/B)
FUEL CELL
A
SHIM
G13009-3
G13009-3
6
3
SHIM
DETAIL A
1
MOUNT ROUTER AFT OF FUEL CELL
G13006-4
DOUBLER
DOUBLER
G13009 TRAY
G13006-4
2
5
SUPPORT HOOK
NAS622CE2
CLIP INSTALLATION
G13006-2 CLIP
4
BOTTOM OF ROUTER
Summary of Contents for P139-HD
Page 2: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 16: ......
Page 17: ......
Page 19: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 58: ......
Page 60: ......
Page 62: ......
Page 64: ......
Page 78: ......
Page 80: ......
Page 82: ......