![Eagle KEE E15 Operator'S Manual Download Page 76](http://html.mh-extra.com/html/eagle/kee-e15/kee-e15_operators-manual_519994076.webp)
E15h SPRAYER- Operations: Data Logger
7.3.5 CHANGE THE JOB NUMBER
• Connect the programmed module to the data logger interface
• Set the sub area on the console to the sub area shown on the job sheet that
relates to the required job number as previously described
7.3.6 SPRAY WITHOUT USING PREPROGRAMMED RATES
• Connect a module to the interface as previously described
• If the module has been pre-programmed with set rates, spraying in SUB AREA
NUMBER
10
will log only, it will not load in any pre-programmed set rates.
• If the module has no pre-programmed set rates, any of the 10 sub area numbers can
be used for logging purposes.
V 1.0 11/05
76
Summary of Contents for KEE E15
Page 1: ...E15 SPRAYER Operators Manual KEE E15 Horticultural Sprayer Console W117 V1 0 ...
Page 9: ...Major Topic Heading V 1 2 Personal Notes 9 ...
Page 10: ...Major Topic Heading V 1 2 Major Topic Heading V 1 2 Personal Notes 10 ...
Page 44: ...E15h SPRAYER Alarm Setup 4 2 SHAFT ALARMS Shaft Alarms Screen 44 V 1 0 11 05 ...
Page 66: ...E15h SPRAYER Operations Sprayer 7 0 OPERATIONS SPRAYER Working Screen 66 66 V 1 0 11 05 ...
Page 100: ...E15h SPRAYER Wiring Diagrams Console Pin outs Economy 100 12 1 ECONOMY LOOMS V 1 0 11 05 ...
Page 101: ...E15h SPRAYER Wiring Diagrams Tractor Loom Economy Looms 101 V 1 0 11 05 ...
Page 102: ...E15h SPRAYER Wiring Diagrams Sprayer Loom Economy Looms 102 V 1 0 11 05 ...
Page 103: ...E15h SPRAYER Wiring Diagrams Sprayer Loom Economy Looms 103 V 1 0 11 05 ...
Page 104: ...E15h SPRAYER Wiring Diagrams Sprayer Loom Economy Looms 104 V 1 0 11 05 ...
Page 105: ...Personal Notes 105 ...
Page 106: ...Major Topic Heading V 1 2 Personal Notes 106 ...
Page 107: ...Major Topic Heading V 1 2 Personal Notes 107 ...
Page 108: ......