Installation, Operation and Parts Manual
EE-6435V2.S/EE-6435V2.B
27
MAINTENANCE
Easy and low cost routine maintenance can ensure the lift work normally and safely. Following are requirements for routine maintenance.
Follow the below routine maintenance schedule with reference to the actual working condition and frequency of your lift.
LUBRICATE moving parts with lithium grease.
S/N
Components
Methods
Period
1
Control buttons
Check if control buttons work as "hold- to -run " and check if they
work as the function indicated.
Every day
2
Synchronization of the ascending
movement
Push the UP button, check and ensure the four mechanical safety
blocks give off sound simultaneously. Both runways shall rise
steadily without abnormal sounds.
Every day
3
Synchronization of mechanical
safety catch
Push the LOCK button, inspect and ensure the four mechanical
safety catches are fully engaged at the same height. Front the rear
side of the runway shall be of the same level.
Every day
4
Synchronization of the descending
movement
Push the DOWN button, inspect and ensure both runways can
descend smoothly.
Every day
5
Max height limit switch
Push the UP button and inspect and ensure the runways stop rising
at maximum lifting height.
Every week
Summary of Contents for EE-6435V2.S
Page 31: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 31...
Page 32: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 32...
Page 33: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 33...
Page 38: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 38...
Page 45: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 45...
Page 48: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 48...
Page 51: ......