Installation, Operation and Parts Manual
EE-6214EKZ
13
4.2 Installation attentions
4.2.1 Joints of oil hose and wiring must be firmly connected in order to avoid leakage of oil hose and looseness of electrical wires.
4.2.2 All bolts should be firmly screwed up.
4.2.3 Do not place any vehicle on the lift in the case of trial running.
4.3 General Installation Steps
ONLY TRAINED AND QUALIFIED INSTALLERS CAN PERFORM LIFT INSTALLATION DUTIES.
Step 1: Remove the packaging, take out the carton for accessories and cover plate.
Step 2: Firstly, put something supporting between the two posts or suspend one of the posts by a crane and then remove the bolts on the
package.
Attention
:
Please pay special attention not to let the post fall down for it may cause casualty or bring damages to the accessories fixed in the
post.
Step 3: When the first post has been taken away, place something supporter under the second post and then remove the bolts on the
package.
Step 4: Fix the standing position for the two posts. (see Annex 1, floor plan)
1. Unfold the package and decide on which post the power unit will be mounted.
2. Draw an outline of the base plate on the ground with chalk and ascertain the position for the post.
Step 5: Connect crossbeam.
Make the posts face to each other and the distance between the posts equals to the length of the overhead crossbeam. Fix the beam to the
posts by screw M12×20.
1.Hex socket cylinder head screw M12x20
2.Spring washing M12
3. Flat washer M12
4. Overhead crossbeam
5. Vehicle roof protection rod
6. Post
1.Hex bolt 2.Iron rack