E2S STExB2X05 Instruction Manual Download Page 8

 

E2S Warning Signals

      Impress House, Mansell Road, Acton, London W3 7QH

www.e2s.com

 

Tel: +44 (0)208 743 8880

Document No. D199-00-201-IS

 

Issue 5

 

28-11-22

Sheet 8 of 8

 

 

Figure 9: Changing of Lens.

 

 
Fit the guard back on to the lens and casting, align the holes 
of the guard, lens and casting. To reattach the lens, the fixings 
MUST be in the order shown in Figure 10.    
 

 

Figure 10: Lens & Guard Fixings Order.

 

 

11) Maintenance, Overhaul and Repair 

 

Maintenance,  repair  and  overhaul  of  the  equipment  should 
only  be  carried  out  by  suitably  qualified  personnel  in 
accordance with the current relevant standards: 
 

EN60079-19/IEC60079-19  Explosive  atmospheres  – 
Equipment repair, overhaul and reclamation 
 
EN  60079-17/IEC60079-17  Explosive  atmospheres  – 
Electrical installations inspection and maintenance 

 
Units must not be opened while an explosive atmosphere is 
present. 
 
If  opening  the  unit  during  maintenance  operations  a  clean 
environment must be maintained and any dust layer removed 
prior to opening the unit. 
 
Repair of the flameproof threaded joints and cemented joints 
is not permitted. 
 
Potential  electrostatic  charging  hazard  -  Clean  only  with  a 
damp cloth. 
 
 
 
 
 
 
 

12) SIL 2 Reliability Data 

 

Reliability and Functional safety IEC/EN61508 which has 
been assessed and is considered suitable for use in low 
demand safety function: 
 
1.  Random Hardware Failures and Architectural constraints 

(route 

2

H

). 

2.  As an unvoted item (i.e. hardware fault tolerance of 0) at 

SIL 2. 

The product was assessed against failure modes: 

 

Failure respond to an input by lighting a beacon. 

 

Spurious light output despite no input.

 

3.

 

When employing the device in a SIL2 compliant system 
the user should ensure frequent or continuous automatic 
monitoring of continuity. 
 

 

Integrity in respect of failure to 

function

 

SIL2

& SIL1

 

Total Failure rate 

0.

48

 pmh 

“Hazardous” failure rate (revealed) 

0

 pmh 

“Hazardous” failure rate (unrevealed) 

0.

48

 pmh 

“Safe” failure rate (revealed) 

0 pmh 

“Safe” failure rate (unrevealed) 

0

System type

B

Hardware Fault Tolerance 

0

Diagnostic Coverage

 

>

60

PFD (hazardous failure) 

2.1

 x 10

-

3

 

Proof Test Interval 

Up to 1 year 

 
 
 
 
 
 
 
 
 

 

 
 
 
 
 
 
 
 

 

 

Summary of Contents for STExB2X05

Page 1: ...4Vdc 145mA 150mA STExB2X05AC115 115Vac 110 120Vac 50 60Hz 140mA 200mA STExB2X05AC230 230Vac 220 240Vac 50 60Hz 70mA 100mA STExB2X10DC024 24Vdc 20 28Vdc 605mA 710mA STExB2X10DC048 48Vdc 42 54Vdc 230mA...

Page 2: ...C Db Ta 50 C to 70 C STExB2 X10AC115 X10AC230 Ex db IIC T4 Gb Ta 50 C to 70 C Ex tb IIIC T128 C Db Ta 50 C to 70 C STExB2 X15DC024 X15DC048 Ex db IIC T4 Gb Ta 50 C to 70 C Ex tb IIIC T127 C Db Ta 55...

Page 3: ...Suitable The certification approval has validated continuous use up to 38 C ambient and are for transient use up to 70 C ambient Installation must be carried out in compliance with the National Elect...

Page 4: ...unit STExB2X21 models shall not be mounted with the lamp down The STEx beacons should be securely bolted to a flat surface using 9 0mm diameter bolt holes in the base of the unit See figure 2 Figure...

Page 5: ...rical engineer who has the necessary training 7 2 Cable Selection and Connections When selecting the cable size consideration must be given to the input current that each unit draws see table 1 the nu...

Page 6: ...certified blanking plugs NEC CEC Requirements Only The cable entries have an M20 x 1 5 6H entry thread If the installation is made using cable glands only suitably rated and certified cable glands mu...

Page 7: ...a minimum resistance value of 3k3 ohms and a minimum wattage of 0 5W or a minimum resistance value of 500 ohms and a minimum wattage of 2W The resistor must be connected directly across the ve and ve...

Page 8: ...nd any dust layer removed prior to opening the unit Repair of the flameproof threaded joints and cemented joints is not permitted Potential electrostatic charging hazard Clean only with a damp cloth 1...

Page 9: ...Page left Intentionally blank...

Page 10: ...R DIMENSIONAL TOLS STANDARDS MOD No REASON INITIAL DATE ISSUE DATE APPROVED CHECKED DATE DATE DRAWN WEIGHT Kg SURFACE FINISH MATERIAL ALTERNATIVE MATERIAL SHEET SCALE TITLE A3 IF IN DOUBT ASK DO NOT S...

Page 11: ...NGULAR DIMENSIONAL TOLS STANDARDS MOD No REASON INITIAL DATE ISSUE DATE APPROVED CHECKED DATE DATE DRAWN WEIGHT Kg SURFACE FINISH MATERIAL ALTERNATIVE MATERIAL SHEET SCALE TITLE A3 IF IN DOUBT ASK DO...

Page 12: ...Netherlands B V Utrechtseweg 310 6812 AR Arnhem Netherlands Quality Assurance Notification Module D SIRA 05 ATEX M342 Provisions fulfilled by the equipment II 2G Ex db IIC T6 T3 Gb II 2D Ex tb IIIC T...

Page 13: ...e and Place of Issue London 03 12 2021 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the m...

Page 14: ...0518 Rake Lane Eccleston Chester CH4 9JN UK Quality Assurance Notification Module D CSAE 22UKQAN0046 Provisions fulfilled by the equipment II 2G Ex db IIC T6 T3 Gb II 2D Ex tb IIIC T85 C T137 C Db IP6...

Page 15: ...nd Place of Issue London 24 02 2022 UKCA Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the ma...

Page 16: ...Page left Intentionally blank...

Reviews: