ADJUSTING THE HEIGHT OF THE DRILL
SYSTEMS (with overlay)
•
On those occasions where there
may be an asphalt overlay on top
of the concrete slab, it may require
the drill frame to be adjusted down
further than what the screw jack
can do. In this case, loosen the 4
– 1/2” bolts on each side of the
mast. Loosen the bolt on the
metal tab on each side, flip the tab
up and re-tighten the bolt. Then
repeat the steps on the previous
slide.
Summary of Contents for 210-3 EQ MT
Page 1: ...SETTING UP THE MODEL 210 3 4 and 5 EQ MT...
Page 15: ...INSTALLING THE DRILL BITS Open the retainer latch on the drill motor Pinch point...
Page 16: ...INSTALLING THE DRILL BITS Place the bit into the chuck and close the latch Pinch point...
Page 27: ...LEVELING THE DRILL SYSTEMS First loosen the two bolts on the Adjusting Arm...