16
Figure 16.1
Mount the hanging straps to the fixed structure or rafters with 2 of the
M8 x 40mm coachscrews provided.
DO NOT
exceed one hanging angle length from fixed structure or
rafters. In the case of double volume roof clearance, manufacture
or extend stable support structure down.
Mount powerhead to hanging straps with 2 of the M8 x 16mm
hexagonal bolts and Nylock nuts provided, using your 13mm
spanners and/ or wrenches.
Use the last 2 of the M8 x 16mm hexagonal bolts and Nylock nuts
with your 13mm spanners and/ or wrenches, to mount cross-
bracing.
Ensure that sufficient cross-bracing is used to disable any sideways
sway of the motorhead when in operation.
You can now commence with the programming and commissioning
schedule.
INSTALLING THE HARDWARE
P E R P E N D I C U L A R
R A F T E R S
S O L I D R O O F
P A R A L L E L R A F T E R S
STEP 5 - MOUNTING MOTORHEAD UNIT AND HANGING STRAPS
Measure, cut and prepare the hanging straps according to the type of
fixed structure or rafter to which the unit is to be mounted.