Xtreme Lead-1 Operation Manual
21
Setup
This section thoroughly describes how to set up your new Xtreme Lead-1
for use. Setup includes unpacking instructions and how to connect the
cables.
Unpacking
Carefully remove Xtreme Lead-1 from the packaging material. Take care to
save the packing materials in case you need to transport the unit. Check to
make sure all components are included and in good condition. If there are
missing or damaged components, contact E-MU Systems immediately for
replacement or repair.
The Xtreme Lead box should include the following components:
•
Xtreme Lead-1 rack unit
•
Power cable
•
Rack mounting ears
•
This operation manual