15
Both the oxygen and copper plates may, from time to time become caked with dirt. This will impede
proper performance of the e-clear system. It is therefore necessary to clean the plates or to have
them cleaned by a certified e-clear technician.
Method for cleaning plates:
•
Switch off the pool pump and e-clear unit
•
Undo nuts at plates to remove electrode cables
•
Unscrew unions at each end of the copper chamber and at each end of the oxygen chamber.
•
Dilute one part pool acid (hydrochloric acid) to five parts water, in a bucket. About a 20cm deep
solution.
•
Immerse each chamber in the acid solution for about 5 minutes or until build-up has dissolved.
•
Immediately rinse in clean water to remove acid residue.
•
Replace both chambers inline so that water in circulation will flow through the oxygen chamber first
then the copper chamber.
•
Replace electrode cables (white to oxygen plated)
6.3
Electrode replacement
Replacement of copper plates and silver electrodes is, preferably to be done by an e-clear certified
Technician.
Method to replace copper plates:
•
Switch off pool pump and e-clear system
•
Undo nuts at plates to remove electrode cables
•
Unscrew unions at each end of copper chamber
•
Remove copper/silver chamber
•
Undo holding nuts (these may be re-used if o-rings intact)
•
Slide out old copper plates, slide in new copper plates so that the plate lug sits over the hole in the
PVC. Screw in bolts tightly. Same process with silver
•
Replace chamber and tighten unions
•
If leaks occur at bolt o-rings, tighten slightly
•
Replace electrode cables.
It is not necessary to change oxygen plates as they are not sacrificial.
6.4
UV lamp replacement
It is preferable for this to be carried out by a qualified electrician or e-clear Technician. Switch off
pool pump and unit
Carefully remove endcaps form UV chamber (be careful to not pull on wires.) Undo electrical wires
from 'chocolate blocks' using a screwdriver Carefully unscrew grey threaded bush, making sure to
retain o-rings. Slide out UV lamp from chamber.
Reconnect old chocolate block to new UV lamp and carefully slide new lamp into UV chamber.
Screw back grey threaded bushes making sure o-rings are re-seated. Re-attach electrical connections
as before
Switch on pool pump only NOT E-CLEAR UNIT, and check for leaks.
Return endcaps
Dispose of UV lamp in accord with government regulations.
Summary of Contents for MK7/CF1-75
Page 7: ...6 UV ON OFF OxidationON OFF IonizationON OFF ...
Page 8: ...7 3 3 Connections 3 3 1 Electrodes connections UV ON OFF Switch ...
Page 21: ...19 8 1 INSTALLATION GUIDE ...
Page 24: ...0 ...
Page 26: ...23 8 1 4 TECHNICAL INSTALLATION GUIDELIES FOR e CLEAR WATER SANITIZERS ...
Page 27: ...24 TECHNICAL INSTALLATION DRAWINGS ...
Page 28: ...25 ...
Page 29: ...26 ...
Page 30: ...27 ...
Page 31: ...28 ...
Page 32: ...29 ...
Page 33: ...30 ...
Page 34: ...31 ...
Page 35: ...32 ...
Page 36: ...33 ...
Page 37: ...34 ...
Page 38: ...35 ...
Page 39: ...36 ...
Page 40: ...37 8 2 MAINTENANCE GUIDE ...
Page 45: ...42 PROBLEM SOLVING GUIDE SECTION 9 _____________________________________________________ ...
Page 51: ...48 SECTION 10 _____________________________________________________ SPARE PARTS ...
Page 54: ...51 SECTION 11 _____________________________________________________ ...
Page 56: ...53 ECO FUSION ONE TAP DRINKING WATER SYSTEM ...
Page 60: ...57 ECO FUSION WHOLE HOUSE DRINKING WATER SYSTEMS ...
Page 61: ...58 C B 11 3 ECO FUSION WHOLE HOUSE DRINKING WATER SYSTEMS A ...
Page 70: ...67 SCIENCE EXPLANTION 11 3 6 e CLEARTM HIGH OUTPUT OXYGEN COPPER IONIZATION CHAMBER ...
Page 71: ...68 E CLEAR ECO FUSIONTM RAINWATER HARVESTING KIT ...
Page 72: ...69 11 4 E CLEAR ECO FUSIONTM RAINWATER HARVESTING KIT ...
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......