Dynabrade 64300 Safety, Operation And Maintenance Download Page 3

Metal Capture Station                                           Machine Setup 

 

2

 

      

   

                         

 
 

There is a water level window located at 
the front of the machine, which indicates 
the proper fill level in the “OFF” position. 
Continue filling the machine until the water 
is approximately ¼” short from the Water 
Level Line as indicated in detail. 

 

 Do not allow the water to fill higher than 
this line. If level is greater than height of 
the Water Level Line, proceed to remove 
water from machine until desired height is 
reached as indicated.  

 

Once the desired level has been reached, 
remove hose from tank and place your 
work surface into position. 

 

Note: The machines auto-fill system will 
bring the water level up to exact run height 
after the machines disconnect is turned to 
the “On” position as described in Step 7 of 
the Machine Setup.

 

 
 
 

 

 
The machine is equipped with a self-filling 
water level system, which requires a 
constant water supply. The machine comes 
with a ¾” female garden hose swivel 
connect located at the rear of the machine 
or you can remove the brass garden hose 
swivel connect and use the ¼” NPT female 
bulkhead fitting for providing a water 
source.

 

 
 
 

 

Summary of Contents for 64300

Page 1: ...when exposed to When operating this equipment basic precautions should always be strictly followed including the instructions listed below of electric shock with an ungrounded power supply 2 Don t ex...

Page 2: ...irst step is to level the machine Having the machine level is crucial for the auto fill sensor to operate properly maintaining critical water level for proper filtration After determining machine loca...

Page 3: ...ht is reached as indicated Once the desired level has been reached remove hose from tank and place your work surface into position Note The machines auto fill system will bring the water level up to e...

Page 4: ...kout mechanism For any maintenance required inside the control box the disconnect will need to be in the off position to open the access door If the disconnect is in the on position the access door wi...

Page 5: ...lower should rotate in a counter clockwise direction from this view of the machine as shown If blower is rotating clockwise interchange any two of the main power leads from the 3 phase supply The mach...

Page 6: ...ng knobs into the threaded holes located around the perimeter of the main tank Leave a 1 8 gap as shown at all 6 locations to allow for the installing of the panels Slide the each panel into place con...

Page 7: ...pproximately 10 seconds and air filtration will begin You can now begin to grind your work piece Direction of grind is very important when speaking to maximum dust collection Be sure to manipulate bot...

Page 8: ...to gain access to the interior of the tank After machine use sludge will collect at the bottom of the tank It is required that sludge be removed daily Remove sludge with a non sparking scoop Adhere t...

Page 9: ...roperly dispose contaminated liquids sludge Hose clean and re install mist traps back into machine and lock down access panel Keeping the liquid level sensors clean from sludge and debris is very impo...

Page 10: ...erial to 1 part sludge Remove any accumulated dust Inspect the Metal Capture Station or Table exhaust vent internal and external surfaces and surrounding work area for any fugitive dust accumulation e...

Page 11: ...e will auto fill to the correct sensory height Once sensor is met the solid red pilot light will dismiss and the green pilot light will illuminate solid indicating it is back to the Ready to Start mod...

Page 12: ...P 2 INTERNAL L3 BLACK 230VAC i10 N NO T2 L3 Q5 Q6 1 1 PILOT LIGHT RED PL2 PILOT LIGHT POWER ON INDICATOR 2 96 NC 95 24V DC 2 POWER SWITCH T3 L2 T3 DC MC1 MOTOR CONTACTOR 45mm 2 WHITE i4 RED WHITE H2O...

Page 13: ...DC SV1 SOLENOID VALVE PL2 PILOT LIGHT POWER ON INDICATOR A2 L2 WHITE BLACK RED PS1 PROXIMITY SENSOR START UP LEVEL RCD RESIDUAL CURRENT DEVICE F1 F6 DC DC DC DC PROXIMITY SENSOR START UP PROXIMITY SEN...

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ...0 85 10 95 RH 0 03 0 50 Component Compliance to IEC60068 2 6 10 500Hz 2G 10min 1cycle 60min each along X Y Z axes Mounting clip 178 7Khrs min MIL HDBK 217F 25 65 5 125 2 100mm W H D 0 75Kg 20pcs 16Kg...

Page 26: ...n No 1 1 2 2 3 4 3 Assignment Assignment FG AC L L1 AC N L2 DC OUTPUT V DC OUTPUT V ADMISSIBLE DIN RAIL TS35 7 5 OR TS35 15 35 2 1 3 TB2 TB1 4 2 1 3 LED V ADJ 125 2 65 5 100 Block Diagram fosc 70KHz O...

Page 27: ......

Page 28: ......

Page 29: ...ED FOR PRODUCTION FN 11 30 OCT 09 TITLE DRAWN CHECKED APPROVED Dynabrade Inc 2006 FINISH MATERIAL 36 METAL FINISH STAT PROJECT NAME TOLERANCES EXCEPT AS NOTED SCALE 2 15 2011 D SIZE G REV 1 1 1 OF 2 6...

Page 30: ...9 Pulley 1 64 97392 35mm DIN RAIL 2 65 97366 FUSE 2 66 97367 FUSE HOLDER 2 67 98746 1 2 LOCK NUT 1 68 68015 WEATHERPROOF J BOX SINGLE DEVICE 1 69 97368 SENSOR BULKHEAD 2 70 97369 BULKHEAD NUT 2 71 974...

Reviews: