9
ASSEMBLY INSTRUCTIONS
11. Attach left charcoal access door (E) to lid and
firebox assembly (B). Insert two hinge bolts
(HH) into hinges on charcoal access door (E)
and secure with two cotter pins (FF).
Repeat for right charcoal access door (S).
Hardware Used
Cotter Pin
Hinge Bolt
x 4
x 4
FF
HH
M6x12 Bolt
Qty
. 27
M6x20 Bolt
Qty
. 14
M5 Shoulder
Bolt
Qty
. 8
M8 W
asher
Qty
. 2
M8 Nut
Qty
. 2
Wheel Axle
Sleeve
Qty
. 2
Hinge Bolt
Qty
. 2
M6 Lock Nut
Qty
. 3
M5 Lock Nut
Qty
. 8
M6x30 Bolt
Qty
. 2
AA
BB
CC
DD
EE
GG
HH
II
JJ
LL
W
rench
Qty
. 1
Cotter Pin
Qty
. 7
FF
KK
M6x12 Bolt
Qty
. 27
M6x20 Bolt
Qty
. 14
M5 Shoulder
Bolt
Qty
. 8
M8 W
asher
Qty
. 2
M8 Nut
Qty
. 2
Wheel Axle
Sleeve
Qty
. 2
Hinge Bolt
Qty
. 2
M6 Lock Nut
Qty
. 3
M5 Lock Nut
Qty
. 8
M6x30 Bolt
Qty
. 2
AA
BB
CC
DD
EE
GG
HH
II
JJ
LL
W
rench
Qty
. 1
Cotter Pin
Qty
. 7
FF
KK
11
HH
FF
B
E
10. With shelf upside down, attach side shelf
support – left rear/right front (W) and side shelf
support – left front/right rear (I) to side shelf
(A) using four M6x12 bolts (AA) on each side.
Repeat for remaining shelf (A).
Hardware Used
M6x12 Bolt
x 8
AA
M6x12 Bolt
Qty
. 27
M6x20 Bolt
Qty
. 14
M5 Shoulder
Bolt
Qty
. 8
M8 W
asher
Qty
. 2
M8 Nut
Qty
. 2
Wheel Axle
Sleeve
Qty
. 2
Hinge Bolt
Qty
. 2
M6 Lock Nut
Qty
. 3
M5 Lock Nut
Qty
. 8
M6x30 Bolt
Qty
. 2
AA
BB
CC
DD
EE
GG
HH
II
JJ
LL
W
rench
Qty
. 1
Cotter Pin
Qty
. 7
FF
KK
10
A
W
AA
I
12. Attach right side shelf (A) to lid and firebox
assembly (B) using four M6x20 bolts (BB).
Repeat on left side with remaining side shelf (A).
NOTE: First secure two upper M6x20 bolts (BB),
then lower M6x20 bolts (BB).
Hardware Used
M6x20 Bolt
x 8
BB
M6x12 Bolt
Qty
. 27
M6x20 Bolt
Qty
. 14
M5 Shoulder
Bolt
Qty
. 8
M8 W
asher
Qty
. 2
M8 Nut
Qty
. 2
Wheel Axle
Sleeve
Qty
. 2
Hinge Bolt
Qty
. 2
M6 Lock Nut
Qty
. 3
M5 Lock Nut
Qty
. 8
M6x30 Bolt
Qty
. 2
AA
BB
CC
DD
EE
GG
HH
II
JJ
LL
W
rench
Qty
. 1
Cotter Pin
Qty
. 7
FF
KK
12
BB
A
B