8.  Locate two V-Saddle blocks, two stainless steel V-Bolts, four stainless steel 3/8" flat washers, 

four stainless steel 3/8" split lock washers and four stainless steel 3/8-16 hex head nuts. Loosely 
assemble (one or two threads beyond the end of the hex nuts) the two V-Bolts to the stainless 
steel Pivot Base Winch Mount as shown below. The V-Bolts will be tightened in a later 
assembly step. 

 
 
 
 
 
 
 
 
 
 
 
9.  Locate two thick stainless steel Backing Plates, two thin stainless steel Backing Plates, two  
 

U-Bolt Saddle blocks, two stainless steel U-Bolts, four stainless steel 3/8" flat washers, four 
stainless steel 3/8" split lock washers and four stainless steel 3/8-16 hex head nuts.  

 
 
 
 
 
 
 
 
 

The two Thick Backing Plates (3/8”) are located next to the U-Bolt Saddles on the inside of the 
insulated channel. The two Thin Backing Plates (1/4”) are used on the rear side of the insulated 
channel. 

 

 

 
 
 
 
 
 
 

 

 
 

          Top of Insulated Channel 

 

         Back and Front views showing the U-Bolt located  

          Showing U-Bolt installed                                         at the Bottom of the Insulated Channel 
 The Thick Spacer is on the front side                            The Thick Spacer is on the front side, the   
 The Thin Spacer is on the rear side                                      Thin Spacer is on the rear side                         

 
 

Loosely assemble (one or two threads beyond the end of the hex nuts) the two U-Bolts and 
associated hardware to the insulated mounting channel as shown above. The U-Bolts will be 
tightened in a later assembly step. 

Summary of Contents for DXE-VA-PIVOT-3

Page 1: ...No 8 130 168 DXE VA PIVOT 3 INS Revision 0b Shown with optional DXE RADP 3 Radial Plate and Optional DXE VGMT 3CG Mounting Pipe DX Engineering 2019 1200 Southeast Ave Tallmadge OH 44278 USA Phone 800...

Page 2: ...tion of a heavy duty mounting pipe set in concrete Specifically 3 OD max high strength galvanized steel tubing with 0 250 minimum wall thickness and 7 minimum length which is available from DX Enginee...

Page 3: ...is not difficult but there are a number of parts that must go together in a certain sequence to make assembly easier Installation Sequence 1 Site Selection 2 Mounting Pipe 3 Coaxial Cable to Mounting...

Page 4: ...g pipe on the gravel use the concrete to fill around the pipe per the concrete instructions Fill the hole until the concrete is level with the ground around it Use a level on the mounting pipe as you...

Page 5: ...e shield of your feedline The DXE RADP 3 Stainless Steel Radial Plate is an ideal optional item which provides an excellent system for attaching radial wires to your vertical antenna system feedpoint...

Page 6: ...optional ground radial wires to the DXE RADP 3 Radial Plate as shown below Additional hardware kits are available DXE RADP 1HWK that contain 20 sets of Radial Plate Hardware There are optional DX Engi...

Page 7: ...tent No 8 130 168 Assembly Drawing The exploded view drawing is for reference and shows the overall Pivot Base Assembly The 3 Mounting Pipe and 3 Antenna Base Section are Customer Supplied Feedpoint h...

Page 8: ...hinge plate backing plate four carriage bolts four 3 8 flat washers four 3 8 split lock washers and four 3 8 hex nuts Assemble the bottom hinge to the bottom of the heavy duty insulated channel as sho...

Page 9: ...ssemble the base side hinge plate to the bottom hinge plate as shown below 5 Locate two V Saddle blocks two stainless steel V Bolts four stainless steel 3 8 flat washers four stainless steel 3 8 split...

Page 10: ...x nuts Assemble the Pivot Base Plate Brackets to the Pivot Base Winch Mount as shown below 7 Locate four 3 8 16 x 1 1 4 long stainless steel hex bolts eight stainless steel 3 8 flat washers four stain...

Page 11: ...stainless steel 3 8 split lock washers and four stainless steel 3 8 16 hex head nuts The two Thick Backing Plates 3 8 are located next to the U Bolt Saddles on the inside of the insulated channel The...

Page 12: ...clearance from the top of your mounting pipe to the bottom side of the winch mounting plate Position the base fixture in the position you pre selected for the pivoting direction Tighten the V Bolt cla...

Page 13: ...ngth of the exposed threads is approximately equal Any clamp should be tightened evenly from side to side with an equal amount of thread above each nut 12 Locate the stainless steel Antenna Hook Mount...

Page 14: ...above each nut Mounting and using the Optional DXE VRW 1 Manual Winch 1 Follow the instructions included with the optional DXE VRW 1 Manual Winch Add On Kit to prepare the Manual Winch for installatio...

Page 15: ...llowing the three bolts to go into the three slots Tighten the hardware to hold the winch in place Connect the Hook from the manual winch strap to the Antenna Hook Mount as shown below To remove the w...

Page 16: ...protect the gears and web strap from weather and environmental effects Locking the Pivot Base To help prevent accidental pivoting ensure the four pivot locking bolts are in place and properly secured...

Page 17: ...ng Stainless Steel Hex Head Cap Screw 4 1 2 x 1 1 4 Stainless Steel Washer 2 1 2 Stainless Steel Lock Washer 2 1 2 13 Stainless Steel Nut Optional DXE VRW 1 Manual Winch Assembly QTY Description 1 150...

Page 18: ...be used on any Stainless Steel nuts bolts clamps or other hardware to prevent galling and thread seizure Any of these products can be used for this purpose PTX 81343 Anti Seize 1 oz Squeeze Tube PTX...

Page 19: ...dable anchors that are produced from recycled PLA Polylactide Resin Depending on the weather conditions they will degrade in about a year They are easily installed and will hold radial wires in place...

Page 20: ...allation damaged from severe weather including floods or abnormal environmental conditions such as prolonged exposure to corrosives or power surges or by the performance of repairs or alterations outs...

Reviews: