65
/
98
SM-1 Ev4/100901
8 Enclosures
– Service bulletins
8.1 Main harness ILD01
– connector
Dvořák – svahové sekačky
s.r.o.
Dvorce 62, 58001 Havlíčkův
Brod
Tel: +420 569 425 767
Fax: +420 569 429 239
Service Bulletin
Bulletin no:
34
Date:
10. 9. 2007
Main harness ILD01 -
connector
Informative
Informative
Technical modification, service is not necessary.
Recommended
Technical modification, by reason of transient failure. Service is recommended.
Obligatory
Technical modification, by reason of danger possibility. Service is obligatory.
Summary
Subject
The Modification of Main harness connector for Spiders ILD01 with control unit NBB.
Valid for
Spider ILD01, sn. 1 - 281, Control unit NBB
Obligation
Preventive or at the earliest exchange of the Control unit NBB
Background
New models of Spider ILD01NBB and every models of Spider ILD02 are fitted by the innovated Control unit
and Remote controller NBB.
Changes:
-
Improvement of communication between Radio controller and control unit
-
Position of the Buttons of the Radio controller
-
Possibility to dismount the drive and steering controller (better service)
-
Skid steering controller is placed on the side of the controller
For full compatibility of Spider ILD01 NBB sn. 1 – 281 is necessary to modified Main harness connector.
Technical description
Circuit of main connector of the Harness has been changed – Original
pin 15
(picture 1) - new
Earthing screw of
main connector
(picture 2)
Original – pin 15
New – Earth of connector
Picture 1
Picture 2
Working time
Summary of Contents for Spider ILD01
Page 1: ...SM 1 Ev4 100901 SERVICE MANUAL SPIDER ILD01...
Page 7: ...7 98 SM 1 Ev4 100901 Ampere meter CEM DT 9701 Voltmeter Ben electronic DT 830 D...
Page 82: ...82 98 SM 1 Ev4 100901 Related documents...
Page 90: ...90 98 SM 1 Ev4 100901...
Page 91: ...91 98 SM 1 Ev4 100901...
Page 94: ...94 98 SM 1 Ev4 100901...