UNCRATING
This unit weighs 450 pounds, and proper equipment must be used to lift and move.
1. Set the total carton, with machine, on a flat, level surface.
CAUTION!
Carton staples are sharp - use proper tools to remove staples.
Do not pull flaps by hand before removing staples!
2. Cut carton at dotted line at bottom. Lift carton over machine, and remove plastic bag.
3. The rear and side covers on the machine must be removed. Turn the two latches ¼ turn and
top edge will move outward. Lift cover upward off retainers.
IMPORTANT
The covers must be reinstalled on the machine after installation!
4. The handle, pallets, and miscellaneous components are located inside the lower base of the
machine. Remove through the rear opening.
5. Remove the (4) lag bolts, one in each inside corner of the base.
6. Using proper equipment, lift machine from packing skid.
OPTIONAL HEAD ASSEMBLIES
1. Optional head assemblies are shipped in a separate carton. Remove staples from smaller
carton top flaps.
2. Lift inner carton from carton. Remove head assembly from carton and packing materials. There
are two dough pallets in the bottom of the outer carton. Remove the protective paper from the
pallets.
3. Dispose of all cartons and packing properly.
INSTALLATION
1. Locate the (4) foundation holes inside the base in all four corners. The machine is designed to
be secured to the floor, See Fig. 1. Arrange on 18 inch square pattern, (4) 3/8"diameter bolts or
studs. (Bolts or studs supplied by others.)