Assembling the remaining thread monitor (2-needle machines)
14
Additional Instructions M-TYPE DELTA - 00.0 - 08/2019
3 Assembling the remaining thread monitor
(2-needle machines)
3.1 Assembling solenoid valve and RFW PCB
Fig. 9: Assembling solenoid valve and RFW PCB (1)
To assemble solenoid valve and RFW PCB:
1. Screw the blanking plug (4) at valve output
2
onto the solenoid
valve (3).
2. Screw the elbow screw joint (5) at valve output
4
onto the solenoid
valve (3).
3. If not yet present, assemble the compressed air maintenance unit to
the stand (see
Operating Instructions
).
4. Disassemble the handwheel (1).
5. Disassemble the belt cover (2).
WARNING
Risk of injury from sharp and moving parts!
Puncture or crushing possible.
Switch off the machine before assembling the
remaining thread monitor (RFW).
(1) - Handwheel
(2) - Belt cover
(3) - Solenoid valve
(4) - Blanking plug
(5) - Elbow screw joint
①
②
④
⑤
③