Assembling the remaining thread monitor (1-needle machines)
Additional Instructions M-TYPE DELTA - 00.0 - 08/2019
9
Fig. 3: Assembling solenoid valve and RFW PCB (2)
6. Assemble the PCB (8) to the holder (9) using 4 spacers (6).
7. Insert the cable (10) at slot
X1
on the PCB (8).
8. Insert the cable (11) at slot
X3
on the PCB (8).
9. Slip 2 jumpers (7) onto the outer pins at slot
X4
.
(6) - Spacer
(7) - Jumper
(8) - PCB
(9) - Holder
(10) - Cable RFW sensor
(11) - Cable
⑥
⑦
⑦
⑧
⑨
⑩
⑪