background image

TUF 100 WALL CLADDING 

Birds Eye View 

D008 

= Rivet 

= 30mm Clout 

Step 2:

 

NOTE:

  It  is  very  important  that  the  Wall 

Sheets  are  positioned  exactly  as  shown  in 
the 

cladding  detail

  diagram  on  the  previous 

page. 

Position Corner Wall  Sheets. Check that the 

Lip is on the correct side of the sheet. While 

holding Corner Wall Sheet flush with the top 

of the Top Plate, nail to plate using only one 

30mm clout top and bottom.  

Step 5:

 Drill  a  hole  through  Door  Jamb  Flashings 

and Wall Sheets top and  bottom. Nail  with 
50mm nails 

(fig. 1)

 

Nail  left  hand  Door  Jamb  Flashing  to  Stud 
using three 30mm Clouts at equal spacings 

(fig.  1)

.  Beside  each  30mm  Clout,  rivet 

Door  Jamb  Flashing  to  Rib.  Repeat  with 
right hand Door Jamb Flashing. 

Step 3:

 Position  All  remaining  Wall  Sheets.  Ensure 

they  overlap  correctly  then  rivet  to  Corner 
Wall  Sheets,  one  rivet  top  and  bottom  on 
each overlap. 

Step 4:

 Nail Wall Sheets to Plates, two 30mm Clouts per pan top and bottom.  

Nail Wall Sheets to Wall Nogs, one clout per pan.  

Summary of Contents for TUF 100

Page 1: ...Quality Made Affordable ASSEMBLY INSTRUCTIONS TUF 100 BASE SIZE 1140mm x 1690mm...

Page 2: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools w...

Page 3: ...00 PARTS LIST Assembly Instructions Roof Flashing End Wall Nogs Front Wall Nog Back Wall Nog 2 1 1 890 1 160 1 1 175 Red 45 x 45 H1 Red 70 x 45 H1 Red 45 x 45 H1 Yellow 45 x 45 H1 FLASHINGS Door Jambs...

Page 4: ...Ensure Green joins to Green and Red joins to Red See fig 2 for nailing detail on Top Front Plate 70x45mm Step 3 Position remaining End Frame on top of plates While someone sup ports frame nail in plac...

Page 5: ...Use ink to mark steel Step 1 Door Jambs Position left hand Door Jamb Flashing at correct measurement from left cladding detail and nail to Top Plate using a 30mm clout Do not fit 50mm nails at this s...

Page 6: ...m clout top and bottom Step 5 Drill a hole through Door Jamb Flashings and Wall Sheets top and bottom Nail with 50mm nails fig 1 Nail left hand Door Jamb Flashing to Stud using three 30mm Clouts at eq...

Page 7: ...d back Fit two more rivets evenly spaced in cen tre of each join Step 3 Line up ribs on the roof with ribs on the walls While someone holds the Front Plate straight nail the roof to Top Plate using on...

Page 8: ...ate Flashing and fit one rivet to top hinge While still hold ing in position fit one rivet to bottom hinge Step 3 Close door and check it fits correctly If not drill out rivets and make necessary adju...

Page 9: ...RITY DOOR Optional Step 1 Place shed in final position Check diagonal meas urements are equal and shed is level before fitting door Step 2 Hold Door in position approximately 5mm down from Top Plate F...

Page 10: ...l Sheets will then protrude 20mm below the Base Plate This will stop water flowing in between the Base Plate and Floor If you choose this option the Floor should be made 15mm smaller than Base Size No...

Page 11: ...in most environments The surface must be dry and free of dirt oil grease and other contaminants prior to painting but no weathering of the surface is required Zinc rich primers are recommended for us...

Page 12: ...nd very severe environmental situations or in any area where the mild steel corrosion rate as published by BRANZ exceeds 200g m2 3 Minimum maintenance must be carried out in accordance with instructio...

Reviews: