MK4A WALL CLADDING 

Step 1: Front  Wall:

 Start at the left hand side. Posi-

tion the Wall Sheet with the LIP on the left hand 
side.  Ensuring  the  LIP  is  flush  with  side  of  the 
Stud and the top of the Top Plate, tack in place. 
Repeat  with Wall  Sheet  on  the  right  hand  side 
of  doorway.  Ensure  Rib  without  LIP  is  on  the 
right hand side of stud then tack in place. Posi-
tion 1/2 Wall Sheets as shown  in the Cladding 
Detail and tack in place. 

Step 2: Back  Wall:

 Position the first Wall Sheet with 

the LIP on the right hand side. Ensuring the LIP 
is flush with the side of the Studs and the top of 
the Wall  Sheet  is  flush  with  the  top  of  the  Top 
Plate,  tack  in  place.  Position  the  next  Wall 
Sheet with the LIP on the right hand side. Over-
lap as shown in (fig 1). Ensuring Wall Sheet is 
flush  with  top  of  Top  Plate,  tack  in  place.  Re-
peat with remaining three sheets. 

Step 4:

 

Nailing  Off:

  Nail  one  30mm  Clout  each  side  of  the  Rib  (two  per  Pan)  into  the  Top  Plates  and  Bottom 

Plates. Nail        Wall Sheets to mid  wall  Nogs (one  per pan). Nail each corner Wall Sheet  to  Studs using two 
30mm Clouts evenly spaced. 

 

Gable Ends: When nailing Gable Wall Sheets to the Top Plate, use a String Line. At the top of the gable nail two 
30mm Clouts into the end of the Ridge Beam. This will stop it from twisting. 

Step 3: End  Walls:

 Lean Gable Wall Sheets against 

the  shed  to  form  gable  shape.  With  the  LIP 
flush  with  side  of  Stud  tack  in  place  ensuring 
the  bottom  of  the  Wall  Sheet  is  10mm  above 
the  bottom  of  the  Bottom  Plate.  Tack  on  re-
maining Wall  Sheets.  Repeat  with  other  gable 
end.  If  fitting  a  window,  nail  in  Window  Studs 
and Nog now. Refer to Window instructions. 

EDGE  
FLUSH 

TOP 

FLUSH 

Summary of Contents for MK4A

Page 1: ...Quality Built In ASSEMBLY INSTRUCTIONS MK4A BASE SIZE 4 210mm x 2545mm...

Page 2: ...g your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools with care Use a Safety Trip...

Page 3: ...0 603m 0 588 x 0 150m 0 710 x 0 240m 1 Fixed Window Frame Glaze Beads Glass Louvre Window Frame Glass Over Panel Window Hardware Pack 2 830m 1 390m 1 390m 0 350m 0 900m 1 Roof Sheets Flat Roof Sheet...

Page 4: ...Base Plate only YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW 1 810 45 45 45 45 1185 1185 1660 4210 45 45 45 FRONT WALL 45 45 45 45 1343 1343 1343 4210 45 45 45 BACK WALL 1900...

Page 5: ...5mm nails per end Note If fitting a window there will be no centre stud on the window side Instead nail in a full length nog 2 405 in Gable or 4 120 in Back Wall using window studs 883 to get correct...

Page 6: ...ack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position Should a Wall Sheet need to be re positioned the nails can easily be prized out If a window is require...

Page 7: ...lap as shown in fig 1 Ensuring Wall Sheet is flush with top of Top Plate tack in place Re peat with remaining three sheets Step 4 Nailing Off Nail one 30mm Clout each side of the Rib two per Pan into...

Page 8: ...ill holes in each corner and nail Window Frame to framing using 50mm nails Step 4 If the Window is in the gable end tempo rarily position the Over Panel above Win dow Frame Following the same angle as...

Page 9: ...ep Flashing in between Door Jambs at bottom of doorway nail through top of flashing using five 30mm Clouts Re peat with the Overdoor Flashing A105 Step 1 Lay out the two window studs 883mm and Nog 590...

Page 10: ...with the LIP on the left hand side For sheds with a Clear Roof Panel go to the next page Posi tion the next Roof Sheet Ensure it overlaps correctly then rivet together one rivet in the centre and one...

Page 11: ...both Roof Sheets Ensure sheet joins are flush at the outside edge then rivet flat sheets to pressed sheets three rivets per join Centralise Roof at the other end and nail in place Step 4 Ensure Ridge...

Page 12: ...shing Position Centre Door Stop on the front face of the Overdoor Flashing and up against the underside of roof Pre drill holes and nail in place with 50mm nails Step 5 Clean out ALL drill filings Als...

Page 13: ...heck Spoutings are straight then rivet to Roof one rivet every second Rib MK4A FLOOR Step 1 Place shed in final position Check the diagonal measurements are the same and the shed is level before fitti...

Page 14: ...Door without the weather strip Slide hook onto square shaft and secure with a lock washer Hook Lock Washer Step 2 Once doors are hung position the Locking Stays so they slide into the Locking Brackets...

Page 15: ...Plate This will stop water flowing in between the Base Plate and Floor The Floor should be made 15mm smaller than Base Size Note Although it is not essential fitting Damp Proof Course in between the B...

Page 16: ...rried out in accordance with instructions below Should the cladding fail to perform as specified above the liability of Riverlea Group Ltd shall in all cases be limited to replacing or repairing the d...

Reviews: