background image

13 

MK4A BARGE & SPOUTING 

Step 1:

 Position  Barge  Flashing  (A102)  on  gable 

ends.  Slide  one  Spouting  (D103)  inside 
another until it measures the correct length. 
Rivet together with four rivets. Repeat with 
the  other  Spouting.  Position  Spouting  on 
the  shed  and  rivet  to  barge  Flashing  at 
each end. Repeat with other Spouting. 

Step 2:

 Centralise  Barge  Flashing  on  gable  end 

and  rivet  in  place,  one  rivet  into  every 
second Rib. Fit  two rivets through top  of 
Barge  into Rib. Repeat  with other Barge 
Flashing.  Check  Spoutings  are  straight, 
then rivet to Roof one rivet every second 
Rib. 

MK4A FLOOR 

Step 1:

  Place  shed in final  position.  Check the  diagonal 

measurements  are  the  same  and  the  shed  is 
level before fitting Floor. It is recommended that 
the shed is anchored down with either a Duratuf 
Bolt Down Kit or Duratuf Peg Down Kit depend-
ing on what the shed is sited on. 

Step 2: 

Lay a Floor Board on top of Bottom Plates and Joist and 
push up against end wall. Mark out where Studs are. Cut 
checkouts  with  Electric  Jigsaw  so  Floor  Board  will  fit 
around Studs. 

Step 3: 

Re-position Floor Board. Lay out remaining Floor 
Boards  checking  around  Studs  as  you  go.  The 
last Floor Board may have to be cut to size. 

Summary of Contents for MK4A

Page 1: ...Quality Built In ASSEMBLY INSTRUCTIONS MK4A BASE SIZE 4 210mm x 2545mm...

Page 2: ...g your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools with care Use a Safety Trip...

Page 3: ...0 603m 0 588 x 0 150m 0 710 x 0 240m 1 Fixed Window Frame Glaze Beads Glass Louvre Window Frame Glass Over Panel Window Hardware Pack 2 830m 1 390m 1 390m 0 350m 0 900m 1 Roof Sheets Flat Roof Sheet...

Page 4: ...Base Plate only YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW 1 810 45 45 45 45 1185 1185 1660 4210 45 45 45 FRONT WALL 45 45 45 45 1343 1343 1343 4210 45 45 45 BACK WALL 1900...

Page 5: ...5mm nails per end Note If fitting a window there will be no centre stud on the window side Instead nail in a full length nog 2 405 in Gable or 4 120 in Back Wall using window studs 883 to get correct...

Page 6: ...ack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position Should a Wall Sheet need to be re positioned the nails can easily be prized out If a window is require...

Page 7: ...lap as shown in fig 1 Ensuring Wall Sheet is flush with top of Top Plate tack in place Re peat with remaining three sheets Step 4 Nailing Off Nail one 30mm Clout each side of the Rib two per Pan into...

Page 8: ...ill holes in each corner and nail Window Frame to framing using 50mm nails Step 4 If the Window is in the gable end tempo rarily position the Over Panel above Win dow Frame Following the same angle as...

Page 9: ...ep Flashing in between Door Jambs at bottom of doorway nail through top of flashing using five 30mm Clouts Re peat with the Overdoor Flashing A105 Step 1 Lay out the two window studs 883mm and Nog 590...

Page 10: ...with the LIP on the left hand side For sheds with a Clear Roof Panel go to the next page Posi tion the next Roof Sheet Ensure it overlaps correctly then rivet together one rivet in the centre and one...

Page 11: ...both Roof Sheets Ensure sheet joins are flush at the outside edge then rivet flat sheets to pressed sheets three rivets per join Centralise Roof at the other end and nail in place Step 4 Ensure Ridge...

Page 12: ...shing Position Centre Door Stop on the front face of the Overdoor Flashing and up against the underside of roof Pre drill holes and nail in place with 50mm nails Step 5 Clean out ALL drill filings Als...

Page 13: ...heck Spoutings are straight then rivet to Roof one rivet every second Rib MK4A FLOOR Step 1 Place shed in final position Check the diagonal measurements are the same and the shed is level before fitti...

Page 14: ...Door without the weather strip Slide hook onto square shaft and secure with a lock washer Hook Lock Washer Step 2 Once doors are hung position the Locking Stays so they slide into the Locking Brackets...

Page 15: ...Plate This will stop water flowing in between the Base Plate and Floor The Floor should be made 15mm smaller than Base Size Note Although it is not essential fitting Damp Proof Course in between the B...

Page 16: ...rried out in accordance with instructions below Should the cladding fail to perform as specified above the liability of Riverlea Group Ltd shall in all cases be limited to replacing or repairing the d...

Reviews: