MK4A HASP & STAPLE
Using seven rivets, attach hasp to
Left Hand Door and the staple to the
Right Hand Door as shown.
RAISED FLOOR MODIFICATION
For sheds being placed on a purpose built floor,
(concrete, cobbles, ply etc.), the Wall Sheets will pro-
trude 20mm below the Base Plate. This will stop water
flowing in between the Base Plate and Floor.
The Floor should be made 15mm smaller than Base
Size.
Note:
Although it is not essential, fitting Damp Proof
Course in between the Base Plate and the Floor
will give added protection against moisture.
CLEAN UP
Remove all swarf
(drill filings) with a soft brush or rag.
Hose down roof and walls thoroughly.
For Coloursteel sheds use touch-up paint provided on all nail heads, rivets and exposed cuts.
15