Duratuf MK4A Assembly Instructions Manual Download Page 5

MK4A TIMBER FRAME 

Step 3:

 Select  two  2.545m  Base  Plates  (Green)  and  two 

2.545m  Top  Plates  (Red).  With  front  wall  lying  on  the 
ground,  nail  Plates  to  frame.  Ensure  Green  joins  to 
Green and Red joins to Red. 

Step 4: 

Position  the  back  wall  frame  on  top  of  plates.  While 
someone  supports  frame,  nail  in  place.  Nail  in  centre 
Stud  using  1.180m  End Wall  Nogs  to  get  correct  posi-
tion. 

Step 6:

 Position a Jack Stud on each end of Ridge Beam and 

nail in place using two 75mm nails each end (

fig.  1

). 

Turnover Ridge Beam / Jack Studs, position centrally 
on  2.545m  Top  Plates  and  nail  to  Top  Plates  using 
two 75mm nails per Jack Stud.  

fig. 1 

Step 5: 

Carefully roll frame over onto its base. (Pieces of timber 
from  the  packaging  may  be  used  to  temporarily  brace 
the  frame  before  rolling  it  over).  Position  1.180m  End 
Wall  Nogs  .883m  down  from  Top  Plate  and  nail  in 
place. If fitting a Kiwi Floor, fit Floor Joists now. Space 
joists equally and nail in place using three 75mm nails 
per end. 

Note:

  If fitting a window, there will be no centre stud on the window side. Instead nail in a full length nog (2.405 in 

Gable or 4.120 in Back Wall) using window studs (.883) to get correct height. Position one window stud cen-
trally beneath the nog and nail in place. Further window studs and Nogs are fitted after the cladding is on. 

Note: 

For sheds with the Raised Floor Modification option the studs will be 1.780m long to allow the Wall Sheets to pro-
trude 20mm below the Bottom Plate. Refer to Raised Floor Modification section (Page 15). 

Step  1:  Back  Wall:

  Select  one  4.210m  Base  Plate  (Green), 

one  4.210m  Top  Plate  (Red)  and  four  Studs  (Yellow). 
Lay out Plates and two Studs on a flat surface and nail 
together using two 75mm nails per join. Nail in remain-
ing centre studs using 1.343m Nogs to get correct posi-
tion.  Position  Nogs  .883m  below  Top  Plate  and  nail  in 
place. 

Step 2: Front  Wall:

 Select one 4.210m Base Plate (Green), 

one 4.210m Top Plate (Red), four Studs (Yellow) and 
two  1.185m  Nogs.  Nail  studs  to  each  end  of  Plates. 
Nail in remaining two studs using 1.185m Nogs to get 
correct position. Position Nogs .883m below Top Plate 
and nail in place. 

Summary of Contents for MK4A

Page 1: ...Quality Built In ASSEMBLY INSTRUCTIONS MK4A BASE SIZE 4 210mm x 2545mm...

Page 2: ...g your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools with care Use a Safety Trip...

Page 3: ...0 603m 0 588 x 0 150m 0 710 x 0 240m 1 Fixed Window Frame Glaze Beads Glass Louvre Window Frame Glass Over Panel Window Hardware Pack 2 830m 1 390m 1 390m 0 350m 0 900m 1 Roof Sheets Flat Roof Sheet...

Page 4: ...Base Plate only YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW 1 810 45 45 45 45 1185 1185 1660 4210 45 45 45 FRONT WALL 45 45 45 45 1343 1343 1343 4210 45 45 45 BACK WALL 1900...

Page 5: ...5mm nails per end Note If fitting a window there will be no centre stud on the window side Instead nail in a full length nog 2 405 in Gable or 4 120 in Back Wall using window studs 883 to get correct...

Page 6: ...ack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position Should a Wall Sheet need to be re positioned the nails can easily be prized out If a window is require...

Page 7: ...lap as shown in fig 1 Ensuring Wall Sheet is flush with top of Top Plate tack in place Re peat with remaining three sheets Step 4 Nailing Off Nail one 30mm Clout each side of the Rib two per Pan into...

Page 8: ...ill holes in each corner and nail Window Frame to framing using 50mm nails Step 4 If the Window is in the gable end tempo rarily position the Over Panel above Win dow Frame Following the same angle as...

Page 9: ...ep Flashing in between Door Jambs at bottom of doorway nail through top of flashing using five 30mm Clouts Re peat with the Overdoor Flashing A105 Step 1 Lay out the two window studs 883mm and Nog 590...

Page 10: ...with the LIP on the left hand side For sheds with a Clear Roof Panel go to the next page Posi tion the next Roof Sheet Ensure it overlaps correctly then rivet together one rivet in the centre and one...

Page 11: ...both Roof Sheets Ensure sheet joins are flush at the outside edge then rivet flat sheets to pressed sheets three rivets per join Centralise Roof at the other end and nail in place Step 4 Ensure Ridge...

Page 12: ...shing Position Centre Door Stop on the front face of the Overdoor Flashing and up against the underside of roof Pre drill holes and nail in place with 50mm nails Step 5 Clean out ALL drill filings Als...

Page 13: ...heck Spoutings are straight then rivet to Roof one rivet every second Rib MK4A FLOOR Step 1 Place shed in final position Check the diagonal measurements are the same and the shed is level before fitti...

Page 14: ...Door without the weather strip Slide hook onto square shaft and secure with a lock washer Hook Lock Washer Step 2 Once doors are hung position the Locking Stays so they slide into the Locking Brackets...

Page 15: ...Plate This will stop water flowing in between the Base Plate and Floor The Floor should be made 15mm smaller than Base Size Note Although it is not essential fitting Damp Proof Course in between the B...

Page 16: ...rried out in accordance with instructions below Should the cladding fail to perform as specified above the liability of Riverlea Group Ltd shall in all cases be limited to replacing or repairing the d...

Reviews: