7
7
PLYWOOD FLOOR
Select
6 x 3040mm Joists
2 x 3130mm Joists
1 x 532mm Joists
1 x 662mm Joists
3 x 555mm Joists
4 x Ply 1565mm x 1200mm
2 x Ply 1565mm x 730mm
• Layout fl oor joists and assemble sub fl oor
frame as shown, nailing joists together
with two 90mm nails per join.
7
3040mm
532mm
555mm
555mm
555mm
662mm
1520mm
1520mm
CL
3130mm
SUB FLOOR FRAME
PLYWOOD SHOWING SCREWS
Screws
1565mm
1565mm
1200mm
1200mm
730mm
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
• Position sub fl oor frame ensuring
frame is well supported, level and
diagonals are correct.
• Using 40mm screws, screw plywood
to sub fl oor frame as shown.
•
Ensure timber fl oor is suffi ciently
secured down to foundation.
Summary of Contents for MARLBOROUGH
Page 1: ...MARLBOROUGH...