SPOUTING & BARGE
• Position front spouting onto front of
roof sheets.
• Using 12 rivets (3 per sheet), rivet
spouting to the ribs on roof sheets.
• Using tin snips, trim 25mm off bottom
fold from front spouting to allow barge
to fi t into front spouting.
• Using tin snips, trim 100mm off bottom
fold at the rear of both barges, to allow
barge to fi t into rear spouting. It is
easier to temporary position barge and
mark barge before cutting.
• Position barges as shown, riveting top
of barge to front and back spouting.
• Rivet underside of barge to underside
of front spouting and back spouting.
• Rivet top of barge to roof sheets, using
6 rivets per barge.
25mm
TRIM