23.
Attach the
center band (CB1B)
to
door
column, corner column
and
center band (CB2B).
See figures
1 and 2.
21
. Insert the
side panel (FSP )
into the groove
of
column (CCB)
. Start at the bottom with panel at
an angle then push into place.
22
. Slide
door column (CDLB)
into the
U-Channel
Base
(B1LB)
on the left side of the door. Line up
the pre-drilled holes on
(CDLB) Column
with pre-
drilled holes on
U-Channel Base (B1LB)
. Secure
with two (
S1
) screws from inside.
(see blowup detail).
12
CDLB
CCB
CB1B
Inside
CCB
B1LB
CDLB
B1LB
S1
CDLB
Fig.2:
Use
(
S1
) screw.
Fix (
CB1B
) to
(CDLB)
CDLB
CB1B
B1LB
2
1
FSP
Note
After completing the center band assembly fully tighten
the four center band fittings
(FCB)
to the corner column
(CCB).
CDLB
Fig.1:
Use
(S1)
screws.
Fix
(CB1B)
to
(FCB)
and
(CB2B).
CB2B
CB1B
FCB
SP
Inside
CCB
B1LB
B1LB
CCB
FSP
FSP
S1
S1