JET VAC ALPHA
BLOCK position. Mount the floor tool onto the hand grip or on the extension tubes and lock everything by sliding the latches (40) to the BLOCK
position. Remember that the command switches on the handle (35-36-37-38) must be on OFF position up to the completing of this operation.
Turbo lance steam/vac (42): to be used by itself or with the small included brushes or with the steam plunger (47) and the steam scraper
(48) according to the cleaning job to be executed.
For mounting this tool please follow the above instructions of the floor tool.
When finished cleaning, it is recommended to vacuum approximately 3-5 litres of clean water to rinse the inside of the hose (33) and the
suction conduits. Wash and dry all accessories used. Remove the vacuum drum (13) and, after emptying and rinsing it, let it dry before
storing it away.
If you are using the brushes of the Kit July (steam only) the bristles can be covered with an absorbing cloth by using the clamps (52A) to
hold the cloth in place. This is a recommended use to clean delicate surfaces (such as precious wood for ex.) or vertical surfaces (in tiles
for ex.) etc. The cloth is acting as dirt "extractor" in this case.
8.
MAINTENANCE
ATTENTION
DISCONNECT FROM ELECTRICAL POWER SUPPLY BEFORE CARRYING OUT USER
MAINTENANCE. IT IS RECOMMENDED THAT BOILER MAINTENANCE IS CARRIED OUT
WHEN THE EQUIPMENT HAS COOLED DOWN. (SWITCHED OFF FOR AT LEAST 5 HOURS)
MAINTENANCE OF STEAM GENERATOR
ELIMINATING SCALE RESIDUE FROM THE BOILER
If you do not know the degree of hardness of the used water we suggest cleaning the boiler after every 24 working hours, if the degree of
hardness is known and lies between 0 and 4 french degrees the frequency can be varied to 100 hours of use.
Fill the water tank, place a recipient container under the machine and remove the boiler drain cap underneath the machine. Then switch on
the machine activating the power switch only (4) and let the water pump work for about 2 minutes, then switch off the machine (power switch
4) and unplug the power cord (1) from the electrical socket and replace the boiler drain cap (6) . The process of cleaning is completed, once
again plug the power cord (1) into the electric outlet and activate the power switch (4). It is recommended to activate also the command
switch (36) for minimum steam on the handgrip and activating the security trigger (34) to release the air contained in the empty boiler. Wait
for the completed cycle of refilling from the pump (approx. 3 min.).
The maintenance of the boiler is completed; proceed with the using instructions as described in chapter 5.
13
DUPLEX
Summary of Contents for JET VAC ALPHA
Page 1: ...JET VAC ALPHA JET VAC ALPHA ENGLISH...
Page 7: ...JET VAC ALPHA 5 TECHNICAL DRAWINGS 7 DUPLEX...
Page 8: ...JET VAC ALPHA 8 DUPLEX...
Page 9: ...JET VAC ALPHA 9 DUPLEX...
Page 10: ...JET VAC ALPHA 10 DUPLEX...
Page 20: ...20 DUPLEX...