DTSL3/FR MKII USER’S MANUAL
15
Chapter
Chapter
Chapter
Chapter 5
5
5
5 ADJUSTMENT
ADJUSTMENT
ADJUSTMENT
ADJUSTMENT
Add
Add
Add
Add oil
oil
oil
oil and
and
and
and check
check
check
check the
the
the
the order
order
order
order of
of
of
of phase
phase
phase
phase
.
After installing lift as Picture 4 required and connecting hydraulic circuit and electric circuit, operate it as following:
-open the hydraulic oil tank, add 18L of hydraulic oil into the oil tank, the hydraulic oil is provided by the user.
Make sure the clean of hydraulic oil, prevent any impurity into the oil line, lead the digest of the oil line and no working of the
solenoid valve.
-Turn on "
MAIN
MAIN
MAIN
MAIN SWITCH
SWITCH
SWITCH
SWITCH
" to turn on power, clicking the ‘UP’ button, check whether the motor turns clockwise (looking
downward), if not turn off "MAIN SWITCH", then to change the phase of the motor.
When
When
When
When turn
turn
turn
turn on
on
on
on power,
power,
power,
power, tttthere
here
here
here will
will
will
will be
be
be
be high
high
high
high voltage
voltage
voltage
voltage exist
exist
exist
exist in
in
in
in the
the
the
the control
control
control
control box,
box,
box,
box, only
only
only
only authori
authori
authori
authorissssed
ed
ed
ed person
person
person
person can
can
can
can operate
operate
operate
operate it.
it.
it.
it.
Oil
Oil
Oil
Oil make-up
make-up
make-up
make-up adjustment
adjustment
adjustment
adjustment
1 Press ‘
UP
UP
UP
UP
’ button, and then motor starts to lift two platforms to go up to the apex.
2 Open the control box of door ,and press “
UP
UP
UP
UP
” button and “SB4" as picture 21 for some minutes
3 Press ‘
DOWN
DOWN
DOWN
DOWN
’ button to let the two platforms go down until the platforms stop at the lower limit switch action position, and then
press "
SECOND
SECOND
SECOND
SECOND DOWN
DOWN
DOWN
DOWN
" button together , and the platforms will go down to the lowest position.
4The oil make-up adjustment process is over.
GROUND
GROUND
GROUND
GROUND BOLTS
BOLTS
BOLTS
BOLTS INSTALLATION:
INSTALLATION:
INSTALLATION:
INSTALLATION:
The ground bolts installation must start after the expiry date on the maintenance of concert, otherwise, it will affect the quality of
solidity.
-Adjust the parallel of the platform and the distance of two platforms as Picture 4 requires.
-Fix the anchor bolts with a percussion electric drill (percussion drill bit is of 16), drill to 120 mm hole and clean the hole.
(Picture 22)
-Use light hammer to install the ground Holts into the hole (need not install the
Central expanded nail of ground bolts, install it after level adjustment.)
Picture 22
Picture 20 adjust level button (SB4)