
6
TABLE #1: SERIES 90 NATURAL GAS
SERIES 90-50
Stock Factory
Btu Value of Natural Gas++
Settings
750
850
950
1000
1050
Altitude in Ft.
0-5,000
5,000-10,000
Normal Input (MBH)
50
–
–
–
–
–
Manifold Pressure In W.C.
2.5
4
4
3.5
2.5
2.5
Orifice
43331094
43331094
SERIES 90-75
Stock Factory
Btu Value of Natural Gas++
Settings
750
850
950
1000
1050
Altitude in Ft.
0-5,000
5,000-10,000
Normal Input (MBH)
75
–
–
–
–
–
Manifold Pressure In W.C.
2.5
3.5
3.5
2.5
2.5
2.5
Orifice
43331092
43331092
SERIES 90-100
Stock Factory
Btu Value of Natural Gas++
Settings
750
850
950
1000
1050
Altitude in Ft.
0-5,000
5,000-10,000
Normal Input (MBH)
100
–
–
–
–
–
Manifold Pressure In W.C.
2.5
3.5
3.5
2.5
2.5
2.5
Orifice
43331090
43331090
++Contact local gas utility or distributor for Btu value of gas.
boilers for use aT HigH alTiTude
The boilers (with the exception of the 90-75 LP product) are factory
equipped for operation at altitudes ranging from 0-10,000 feet above
sea level. No changes to the factory settings are required for instal-
lations from 0-5,000 feet above sea level. For altitudes from 5,000-
10,000 feet above sea level the gas manifold pressure will need to be
adjusted based upon calorific (Btu) value of supply gas (contact local
gas utility or distributor for this value). For specific settings refer to
Table #1 for natural gas applications and
Table #2
for LP gas ap-
plications. Instructions on how to adjust the gas manifold pressure
settings are shown in
Figures 17 & 18
.
Note that 90-75 LP applications for 5,000 - 10,000 feet above sea
level will require an orifice change as well as a gas manifold pres-
sure adjustment based upon calorific (Btu) value of supply gas. Refer
to
Table #2
for altitude orifice kit part number. For replacing the
orifice refer to specific instructions included with the kit.
Summary of Contents for 90-100
Page 13: ...13 Figure 3 Multi zone Boiler Piping With Zone Valves Near Boiler Piping...
Page 16: ...16 Figure 6 Diaphragm Type Expansion Tank Piping Near Boiler Piping...
Page 17: ...17 Figure 7 Conventional closed type Expansion Tank Piping Near Boiler Piping...
Page 23: ...23 Figure 11 Combustion Air and Vent Piping Combustion Air and Vent Pipe...
Page 27: ...27 Figure 13 Field Wiring Connections Electrical Wiring...
Page 44: ...44 Service Hints Detailed Sequence Of Operation...
Page 50: ...50 TROUBLESHOOTING CHART 2 Troubleshooting...
Page 53: ...53 TROUBLESHOOTING CHART 5 Troubleshooting...
Page 56: ...85 Middle Rd Dunkirk NY 14048...