ph: 519-923-9813 | [email protected]| web: www.dundalkleisurecraft.com
Fig 2a
Fig 2b
Start the front wall by securing the glass panel to the
post using the 2 ¾” (70mm) lag screws in the pre drilled
holes.
Ensure the panel and post are flush.
Ensure the panel and corner post are flush and secure
the panel to the post using the 2 ¾” (70mm) lag screws
in the pre drilled holes to complete the side wall.
Grab your door and secure it to the glass panel using
the 2 ¾” (70mm) lag screws in the pre drilled holes in
the same manner as previous steps.
Indoor Pure Cube Sauna
Assembly Instructions
6
Place the last glass panel in-between the door and the
post and secure to both in the same manner as the
previous step.