ph: 519-923-9813 | [email protected]| web: www.dundalkleisurecraft.com
Fig 2a
Fig 2b
From the inside of the sauna, secure the trim piece
through the pre drilled holes using the 2 ¾” (70mm)
Connector Lag Bolts .
Line up the side trim piece with the edge of the wall
panel ensuring it is flush to the front post.
Line up the roof trim on the opposite side and secure in
the same manner as the previous step.
Indoor Pure Cube Sauna
Assembly Instructions
9
Line up the front and back pieces of roof trim in the
same manner and secure from the inside of the sauna
using the 2 ¾” (70mm) Connector Lag Bolts .