A/A DC INVERTER U-MATCH AIR CONDITIONERS INSTALLATION
83
swing motor lead wire get caught in the sealing material.)
Screw all 4 hexagon head screws located right beneath the latches in approximately 15mm.(Panel will rise)
Adjust the panel by turning it to the arrowed direction in Fig.4 so that the ceiling opening is completely covered.
Tighten the screws until the thickness of the sealing material between the panel and the indoor unit body is
reduced to 5~8 mm.
2
)
Precautions:
Improper screwing of the screws may cause the troubles shown in Figure 1-3-14.
Figure 1-3-14
If gap is still left between the ceiling and the panel after screwing the screws, readjust the height of the indoor
unit body (Refer to Figure 1-3-15)
Figure 1-3-15
After fixing be sure no gap left between the ceiling and the panel
3
)
Wiring of the decoration panel.
Connect the joints for swing flap motor lead wire (at 2 places) installed on the panel (Refer to Figure 1-3-16)
Figure 1-3-16
Contamination dew condensation,dew dripping
Air leak
Air leak from ceiling
No gap is allowed