8) IF USING THE VANDAL RESISTANT HARDWARE ACCESSORY KIT
REMOVE & TIGHTEN ALL COVER SPANNER SCREWS TO 16 IN-LBS
3) AFTER ROUTING WIRES
AS SHOWN ATTACH PIPE
NIPPLE WIRING TO BUILDING
AC INPUT,STUFF INTO BACK BOX.
10) REMOVE CENTER K.O.
FOR PROPER N4X MTG.
ROUTE WIRES THRU
CENTER K.O.
BUILDING
BACK BOX
1) AFFIX PIPE NIPPLE
ASSY TO CANOPY
2) AFFIX NUT TO PIPE NIPPLE ASSY
AND TIGHTEN TO 40/50 IN-LBS
4) AFFIX SPIDER PLT
TO BACKBOX USING
BACK BOX SCREWS
6) AFFIX CANOPY ASSY ONTO
SPIDER PLT USING PROVIDED
SCREWS
7) AFFIX PROVIDED
GASKET TO
CANOPY
12) AFFIX SIGN ASSY ONTO
PIPE NIPPLE AND SECURE
USING PROVIDED NUT
TO 40 IN-LBS
13) USE WIRING DIAGRAM
FOR PROPER WIRING
OF SIGN AND AFFIX
WIRES INTO PUSH
CONNECTORS
93094183
11) ATTACH ADHESIVE
WIRING SADDLE
AND ROUTE WIRES
THRU LITE-BOX
CUTOUTS
14) CONNECT BATTERY
IF REQUIRED TO PCB
15) REMOVE CHEVRONS IF (REQUIRED)
BY DRIVING CHEVRONS TOWARDS
BACK OF STENCIL TAPPING
AROUND CHVRON PERIMETER
FROM FRONT OF STENCIL
WALL MOUNT N4X INSTALLATION
IMPORTANT: TO WEATHERPROOF FOR OUTDOOR INSTALLATION,
BE SURE TO SEAL ALL OPENINGS-MOUNTING, CONDUIT, ETC.
5) REMOVE ADHESIVE BACKING
FROM GASKET & APPLY TO
CANOPY
9) REMOVE STENCIL
ASSY
TRANSFORMER
CONNECTOR TO
LED PCB (J1)
WIRE HARNESS
FROM HEATER
ASSY 7 PIN
CONNECTOR
(WHEN PROVIDED)
TO GROUND
CONNECTION
ON FRAME
277
120
COM
TO JUNCTION
BOX
3 PIN PUSH
CONNECTOR (QTY 4)
SUPPLIED PIGTAIL LEADS
PREWIRED AT FACTORY
BLK
WHT
GREEN (GROUND)
PIGTAIL LEAD
RED
PIGTAIL LEAD
BLK
PIGTAIL LEAD
WHT
PIGTAIL LEAD
ORG
BLK
WHT
GREEN
WIRING DIAGRAM
AC
TRANSFORMER
120VAC-CONNECT BLACK & WHITE LEADS.
277VAC-CONNECT RED & WHITE LEADS.
93094622
11) AFFIX SIGN ASSY ONTO
PIPE NIPPLE AND SECURE
USING PROVIDED NUT
TO 40 IN-LBS
1) AFFIX PIPE NIPPLE
ASSY TO CANOPY
3) AFTER ROUTING WIRES
AS SHOWN ATTACH PIPE
NIPPLE WIRING TO BUILDING
AC INPUT, STUFF INTO BACK BOX.
5) REMOVE ADHESIVE BACKING
FROM GASKET & APPLY TO
CANOPY
4) AFFIX SPIDER PLT
TO BACKBOX USING
BACK BOX SCREWS
6) AFFIX CANOPY ASSY
ONTO SPIDER PLT
USING PROVIDED
SCREWS
BUILDING
BACK BOX
7) AFFIX PROVIDED
GASKET TO
CANOPY
12) USE WIRING DIAGRAM
FOR PROPER WIRING
OF SIGN AND AFFIX
WIRES INTO PUSH
CONNECTORS
13) CONNECT BATTERY
IF PROVIDED TO PCB
10) REMOVE PIPE PLUG
FOR CEILING MTG
10) REMOVE PIPE PLUG
FOR END MTG
9) REMOVE STENCIL
ASSY
14) REMOVE CHEVRONS IF (REQUIRED)
BY DRIVING CHEVRONS TOWARDS
BACK OF STENCIL TAPPING
AROUND CHVRON PERIMETER
FROM FRONT OF STENCIL
2) AFFIX NUT TO PIPE NIPPLE ASSY
AND TIGHTEN TO 40/50 IN-LBS
8) IF USING THE VANDAL RESISTANT HARDWARE ACCESSORY KIT
REMOVE & TIGHTEN ALL COVER SPANNER SCREWS TO 16 IN-LBS
Wall Mount N4X Installation
IMPORTANT: TO WEATHERPROOF FOR OUTDOOR INSTALLATION,
BE SURE TO SEAL ALL OPENINGS-MOUNTING, CONDUIT, ETC.
WIRING DIAGRAM
AC
TRANSFORMER
120VAC CONNECT BLACK & WIITE LEADS
277VAC CONNECT RED & WHITE LEADS
CEILING OR END MOUNT
N4X INSTALLATION
IMPORTANT: TO WEATHERPROOF FOR OUTDOOR INSTALLATION,
BE SURE TO SEAL ALL OPENINGS-MOUNTING, CONDUIT, ETC.
FOR END MOUNTING OF SIGN USE SAME PROCEDURES AS CEILING